Sol Systems
Sol Systems has 9 planned power projects totaling 1.2 GW and 3 operating projects totaling 420 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 50% is past its listed in-service date. 72 contacts at the company are on file.
Where Sol Systems' planned pipeline sits
Planned MW by state. The 4 largest states hold 1.2 GW of the 1.2 GW.
for every MW Sol Systems operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 9 | 1.2 GW | 3 | 420 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Sol Systems' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2020 | 1 | 70 MW |
| 2021 | 1 | 70 MW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 2 | 300 MW |
| 2025 | 1 | 150 MW |
| 2026 | 2 | 360.9 MW |
| 2027 | 2 | 232 MW |
Pipeline by grid and queue year
Sol Systems' planned MW leans on Midcontinent ISO (MISO), ERCOT and PJM Interconnection. Midcontinent ISO (MISO) alone holds 50% of it.
Planned MW by grid operator
9 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 5 | 590 MW |
| ERCOT | 2 | 360.9 MW |
| PJM Interconnection | 2 | 232 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 2 | 140 MW |
| 2017 | 0 | 0 MW |
| 2018 | 2 | 300 MW |
| 2019 | 2 | 330.9 MW |
| 2020 | 2 | 232 MW |
Changes since the June 4, 2026 snapshot
What moved in Sol Systems' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Sol Systems' pipeline moves.
Sol Systems against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Sol Systems ranks 146 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 146 | Sol Systems this page | 9 | 3 | 0.36 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Sol Systems72 people at Sol Systems
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 21 managers and 21 directors are where interconnection and procurement decisions start.
By seniority
72 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 5 |
| Owner | 1 |
| VP | 12 |
| Director | 21 |
| Manager | 21 |
| Senior | 12 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Sol Systems project
All 12 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 72 contacts.
Get alerts for Sol Systems
We email you when Sol Systems adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Sol Systems project and the 72 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.