SMT Energy

Power developer5 projects on record Data as of

SMT Energy has 1 planned power project totaling 164.6 MW and 4 operating projects totaling 334 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 7 contacts at the company are on file.

164.6MW
planned, 1 project
334MW
operating, 4 projects
164.6MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
7
contacts on file
Map

Where SMT Energy's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas164.6 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.5MW planned

for every MW SMT Energy operates today.

PlannedOperating
Battery Storage 164.6 MW
334 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage1164.6 MW4334 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed164.6 MW, 100%
1 of 1 planned project (100%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of SMT Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of SMT Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 164.6 MW 2026
View as table
YearProjectsMW
20261164.6 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

SMT Energy's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

1 planned project

ERCOT 164.6 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT1164.6 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

050100150200 164.6 MW 2023
View as table
Queue yearProjectsMW
20231164.6 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in SMT Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: SMT EnergyChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when SMT Energy's pipeline moves.

Request access

SMT Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. SMT Energy ranks 555 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
555 SMT Energy this page 1
164.6 MW
4
334 MW
2.03

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus SMT Energy

7 people at SMT Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 manager and 2 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

7 contacts

Founder 1
Head 1
VP 2
Director 2
Manager 1
View as table
SeniorityContacts
Founder1
Head1
VP2
Director2
Manager1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 7 contacts
PersonTitleDepartmentSeniorityContact
7 contacts at SMT Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every SMT Energy project

All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: SMT EnergySort: MW, largest first 5 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
5 projects and 498.6 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.

Request access

Get alerts for SMT Energy

We email you when SMT Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every SMT Energy project and the 7 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.