Silicon Ranch
Silicon Ranch has 35 planned power projects totaling 2 GW and 36 operating projects totaling 963.6 MW in the FieldProspects database. 47% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 124 contacts at the company are on file.
Where Silicon Ranch's planned pipeline sits
Planned MW by state. The 6 largest states hold 1.8 GW of the 2 GW.
Largest states
- Georgia547 MW6 projects, 28% of planned
- Tennessee535.6 MW8 projects, 27% of planned
- Mississippi364.8 MW4 projects, 19% of planned
- South Carolina150 MW2 projects, 8% of planned
- Washington130 MW1 project, 7% of planned
- Alabama117.8 MW5 projects, 6% of planned
3 more states with less.
for every MW Silicon Ranch operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 35 | 2 GW | 36 | 963.6 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Silicon Ranch's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 10 | 421 MW |
| 2027 | 23 | 1.4 GW |
| 2028 | 1 | 2.8 MW |
| 2029 | 1 | 150 MW |
Pipeline by grid and queue year
Silicon Ranch's planned MW leans on Tennessee Valley Authority, Southern Company and Grant County PUD. Tennessee Valley Authority alone holds 52% of it.
Planned MW by grid operator
35 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Tennessee Valley Authority | 16 | 1 GW |
| Southern Company | 8 | 632.8 MW |
| Grant County PUD | 1 | 130 MW |
| Dominion Energy South Carolina | 1 | 100 MW |
| Duke Energy Carolinas | 1 | 50 MW |
| Midcontinent ISO (MISO) | 8 | 37.9 MW |
Changes since the June 4, 2026 snapshot
What moved in Silicon Ranch's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Silicon Ranch's pipeline moves.
Silicon Ranch against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Silicon Ranch ranks 82 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 82 | Silicon Ranch this page | 35 | 36 | 0.49 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Silicon Ranch124 people at Silicon Ranch
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 56 managers and 21 directors are where interconnection and procurement decisions start.
By seniority
124 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Owner | 1 |
| Head | 1 |
| VP | 13 |
| Director | 21 |
| Manager | 56 |
| Senior | 27 |
| Unknown | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Silicon Ranch project
All 71 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 124 contacts.
Get alerts for Silicon Ranch
We email you when Silicon Ranch adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.