FieldProspects

Silicon Ranch

Power developer71 projects on record Data as of

Silicon Ranch has 35 planned power projects totaling 2 GW and 36 operating projects totaling 963.6 MW in the FieldProspects database. 47% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 124 contacts at the company are on file.

2GW
planned, 35 projects
963.6MW
operating, 36 projects
915.7MW
interconnection agreement signed, 47% of planned
906.1MW
under construction, 12 projects
0MW
past due, 0 projects
124
contacts on file
Map

Where Silicon Ranch's planned pipeline sits

Planned MW by state. The 6 largest states hold 1.8 GW of the 2 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Georgia547 MW6 projects, 28% of planned
  2. Tennessee535.6 MW8 projects, 27% of planned
  3. Mississippi364.8 MW4 projects, 19% of planned
  4. South Carolina150 MW2 projects, 8% of planned
  5. Washington130 MW1 project, 7% of planned
  6. Alabama117.8 MW5 projects, 6% of planned

3 more states with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2MW planned

for every MW Silicon Ranch operates today. Solar is most of the gap.

PlannedOperating
Solar 2 GW
963.6 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar352 GW36963.6 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed915.7 MW, 47%
14 of 35 planned projects (40%)
Under construction906.1 MW, 46%
12 of 35 planned projects (34%)
Past due0 MW, 0%
0 of 35 planned projects (0%)
0% of Silicon Ranch's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Silicon Ranch's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 421 MW 2026 1.4 GW 2027 2028 2029
View as table
YearProjectsMW
202610421 MW
2027231.4 GW
202812.8 MW
20291150 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Silicon Ranch's planned MW leans on Tennessee Valley Authority, Southern Company and Grant County PUD. Tennessee Valley Authority alone holds 52% of it.

Figure 2

Planned MW by grid operator

35 planned projects

Tennessee Valley Authority 1 GW 16 projects
Southern Company 632.8 MW 8 projects
Grant County PUD 130 MW 1 project
Dominion Energy South Carolina 100 MW 1 project
Duke Energy Carolinas 50 MW 1 project
Midcontinent ISO (MISO) 37.9 MW 8 projects
View as table
GridPlanned projectsPlanned MW
Tennessee Valley Authority161 GW
Southern Company8632.8 MW
Grant County PUD1130 MW
Dominion Energy South Carolina1100 MW
Duke Energy Carolinas150 MW
Midcontinent ISO (MISO)837.9 MW
Source. Balancing authorities as listed in the queue

Changes since the June 4, 2026 snapshot

What moved in Silicon Ranch's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
7
came online
3
cancelled, inactive or dropped
4
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Silicon RanchChange: any 22 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
22 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Silicon Ranch's pipeline moves.

Request access

Silicon Ranch against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Silicon Ranch ranks 82 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
82 Silicon Ranch this page 35
2 GW
36
963.6 MW
0.49

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Silicon Ranch

124 people at Silicon Ranch

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 56 managers and 21 directors are where interconnection and procurement decisions start.

Figure 3

By seniority

124 contacts

C-Suite 4
Owner 1
Head 1
VP 13
Director 21
Manager 56
Senior 27
Unknown 1
View as table
SeniorityContacts
C-Suite4
Owner1
Head1
VP13
Director21
Manager56
Senior27
Unknown1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 124 contacts
PersonTitleDepartmentSeniorityContact
124 contacts at Silicon Ranch for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Silicon Ranch project

All 71 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Silicon RanchSort: MW, largest first 71 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
71 projects and 2.9 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 124 contacts.

Request access

Get alerts for Silicon Ranch

We email you when Silicon Ranch adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Silicon Ranch project and the 124 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.