Shell
Shell has 7 planned power projects totaling 1 GW and 1 operating project totaling 9.9 MW in the FieldProspects database. 29% of the planned capacity has an interconnection agreement and 2% is past its listed in-service date. The projects sit in 2 states and 3 technologies.
Where Shell's planned pipeline sits
Planned MW by state. The 2 largest states hold 1 GW of the 1 GW.
for every MW Shell operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 4 | 657.4 MW | 1 | 9.9 MW |
| Solar | 2 | 351.7 MW | 0 | 0 MW |
| Wind | 1 | 22.4 MW | 0 | 0 MW |
MW by technologySolar and Wind have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Shell's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2025 | 1 | 22.4 MW |
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 1 | 156.5 MW |
| 2029 | 4 | 701.7 MW |
| 2030 | 1 | 150.8 MW |
Pipeline by grid and queue year
Shell's planned MW leans on ERCOT and Southwest Power Pool (SPP). ERCOT alone holds 71% of it.
Planned MW by grid operator
7 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 5 | 731.4 MW |
| Southwest Power Pool (SPP) | 2 | 300 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2025 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2020 | 1 | 22.4 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 2 | 300 MW |
| 2024 | 1 | 150.8 MW |
| 2025 | 3 | 558.2 MW |
Changes since the June 4, 2026 snapshot
What moved in Shell's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Shell's pipeline moves.
Shell against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Shell ranks 164 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 164 | Shell this page | 7 | 1 | 0.01 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus ShellEvery Shell project
All 8 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Shell
We email you when Shell adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Shell project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.