Scout Clean Energy
Scout Clean Energy has 15 planned power projects totaling 1.9 GW and 1 operating project totaling 161 MW in the FieldProspects database. 66% of the planned capacity has an interconnection agreement and 9% is past its listed in-service date. 127 contacts at the company are on file.
Where Scout Clean Energy's planned pipeline sits
Planned MW by state. The 6 largest states hold 1.9 GW of the 1.9 GW.
for every MW Scout Clean Energy operates today. Wind is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Wind | 11 | 1.3 GW | 0 | 0 MW |
| Solar | 2 | 500 MW | 1 | 161 MW |
| Battery Storage | 2 | 106.7 MW | 0 | 0 MW |
MW by technologyWind and Battery Storage have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Scout Clean Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2024 | 1 | 180 MW |
| 2025 | 0 | 0 MW |
| 2026 | 8 | 563 MW |
| 2027 | 1 | 180 MW |
| 2028 | 4 | 824 MW |
| 2029 | 1 | 190.9 MW |
Pipeline by grid and queue year
Scout Clean Energy's planned MW leans on Southwest Power Pool (SPP), ERCOT and California ISO (CAISO). Southwest Power Pool (SPP) alone holds 26% of it.
Planned MW by grid operator
15 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Southwest Power Pool (SPP) | 3 | 504 MW |
| ERCOT | 1 | 400 MW |
| California ISO (CAISO) | 7 | 380 MW |
| Midcontinent ISO (MISO) | 2 | 363 MW |
| PJM Interconnection | 2 | 290.9 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2024 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 2 | 260 MW |
| 2018 | 1 | 72 MW |
| 2019 | 2 | 370.9 MW |
| 2020 | 3 | 215.4 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 1 | 400 MW |
Changes since the June 4, 2026 snapshot
What moved in Scout Clean Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Scout Clean Energy's pipeline moves.
Scout Clean Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Scout Clean Energy ranks 89 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 89 | Scout Clean Energy this page | 15 | 1 | 0.08 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Scout Clean Energy127 people at Scout Clean Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 63 managers and 26 directors are where interconnection and procurement decisions start.
By seniority
127 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Founder | 1 |
| VP | 11 |
| Director | 26 |
| Manager | 63 |
| Senior | 23 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Scout Clean Energy project
All 16 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 127 contacts.
Get alerts for Scout Clean Energy
We email you when Scout Clean Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Scout Clean Energy project and the 127 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.