Savion
Savion has 34 planned power projects totaling 6.5 GW and 5 operating projects totaling 591 MW in the FieldProspects database. 81% of the planned capacity has an interconnection agreement and 3% is past its listed in-service date. 93 contacts at the company are on file.
Where Savion's planned pipeline sits
Planned MW by state. The 6 largest states hold 5.5 GW of the 6.5 GW.
for every MW Savion operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 23 | 4.4 GW | 5 | 591 MW |
| Battery Storage | 11 | 2.1 GW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Savion's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2022 | 1 | 125 MW |
| 2023 | 0 | 0 MW |
| 2024 | 0 | 0 MW |
| 2025 | 1 | 100 MW |
| 2026 | 2 | 348.1 MW |
| 2027 | 7 | 1.1 GW |
| 2028 | 9 | 1.5 GW |
| 2029 | 7 | 1.1 GW |
| 2030 | 7 | 2.3 GW |
Pipeline by grid and queue year
Savion's planned MW leans on PJM Interconnection, ERCOT and Southwest Power Pool (SPP). PJM Interconnection alone holds 41% of it.
Planned MW by grid operator
34 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 14 | 2.7 GW |
| ERCOT | 8 | 1.7 GW |
| Southwest Power Pool (SPP) | 5 | 1.2 GW |
| Midcontinent ISO (MISO) | 4 | 622.6 MW |
| New York ISO (NYISO) | 3 | 325 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 2 | 150 MW |
| 2017 | 4 | 389.9 MW |
| 2018 | 1 | 250.9 MW |
| 2019 | 5 | 810 MW |
| 2020 | 9 | 2.6 GW |
| 2021 | 3 | 399 MW |
| 2022 | 4 | 652.2 MW |
| 2023 | 0 | 0 MW |
| 2024 | 5 | 1 GW |
Changes since the June 4, 2026 snapshot
What moved in Savion's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Savion's pipeline moves.
Savion against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Savion ranks 25 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 25 | Savion this page | 34 | 5 | 0.09 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Savion93 people at Savion
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 41 managers and 23 directors are where interconnection and procurement decisions start.
By seniority
93 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Head | 1 |
| VP | 12 |
| Director | 23 |
| Manager | 41 |
| Senior | 14 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Savion project
All 39 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 93 contacts.
Get alerts for Savion
We email you when Savion adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Savion project and the 93 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.