FieldProspects

Santee Cooper

Power developer1 project on record Data as of

Santee Cooper has 1 planned power project totaling 74.9 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 1 technology.

74.9MW
planned, 1 project
0MW
operating, 0 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
state
Map

Where Santee Cooper's planned pipeline sits

Planned MW by state. Everything sits in South Carolina.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. South Carolina74.9 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
74.9 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 74.9 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar174.9 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 1 planned project (0%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
None of Santee Cooper's planned MW sits in the seven ISO queues, where 11% of planned MW is past due across all developers.

Share of Santee Cooper's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
020406080 Snapshot year 2026 2027 74.9 MW 2028
View as table
YearProjectsMW
202600 MW
202700 MW
2028174.9 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Santee Cooper's planned MW sits entirely in Dominion Energy South Carolina.

Figure 2

Planned MW by grid operator

1 planned project

Dominion Energy South Carolina 74.9 MW 1 project
View as table
GridPlanned projectsPlanned MW
Dominion Energy South Carolina174.9 MW

Santee Cooper against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Santee Cooper ranks 657 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
657 Santee Cooper this page 1
74.9 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Santee Cooper

Every Santee Cooper project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Santee CooperSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 74.9 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Santee Cooper

We email you when Santee Cooper adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Santee Cooper project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.