FieldProspects

Sanders Hollow Energy Center, LLC

Power developer2 projects on record Data as of

Sanders Hollow Energy Center, LLC has 2 planned power projects totaling 594.6 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date.

594.6MW
planned, 2 projects
0MW
operating, 0 projects
594.6MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
state
Map

Where Sanders Hollow Energy Center, LLC's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas594.6 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
594.6 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 302 MW
none
Wind 292.6 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage1302 MW00 MW
Wind1292.6 MW00 MW

MW by technologyBattery Storage and Wind have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed594.6 MW, 100%
2 of 2 planned projects (100%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Sanders Hollow Energy Center, LLC's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Sanders Hollow Energy Center, LLC's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2026 2027 2028 594.6 MW 2029
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
20292594.6 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Sanders Hollow Energy Center, LLC's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

2 planned projects

ERCOT 594.6 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT2594.6 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2025 was the biggest year.

0100200300400 2024 302 MW 2025
View as table
Queue yearProjectsMW
20241292.6 MW
20251302 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Sanders Hollow Energy Center, LLC's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
2
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Sanders Hollow Energy Center, LLCChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Sanders Hollow Energy Center, LLC's pipeline moves.

Request access

Sanders Hollow Energy Center, LLC against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Sanders Hollow Energy Center, LLC ranks 257 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
257 Sanders Hollow Energy Center, LLC this page 2
594.6 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Sanders Hollow Energy Center, LLC

Every Sanders Hollow Energy Center, LLC project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Sanders Hollow Energy Center, LLCSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 594.6 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Sanders Hollow Energy Center, LLC

We email you when Sanders Hollow Energy Center, LLC adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Sanders Hollow Energy Center, LLC project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.