Samsung Renewable Energy

Power developer56 projects on record Data as of

Samsung Renewable Energy has 53 planned power projects totaling 8.5 GW and 3 operating projects totaling 700 MW in the FieldProspects database. 26% of the planned capacity has an interconnection agreement and 3% is past its listed in-service date. The projects sit in 6 states and 2 technologies.

8.5GW
planned, 53 projects
700MW
operating, 3 projects
2.2GW
interconnection agreement signed, 26% of planned
215.2MW
under construction, 3 projects
283.9MW
past due, 2 projects
6
states
Map

Where Samsung Renewable Energy's planned pipeline sits

Planned MW by state. The 6 largest states hold 8.5 GW of the 8.5 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas7.5 GW46 projects, 88% of planned
  2. Wisconsin400 MW2 projects, 5% of planned
  3. Ohio200 MW2 projects, 2% of planned
  4. Michigan200 MW1 project, 2% of planned
  5. Georgia150 MW1 project, 2% of planned
  6. Missouri100 MW1 project, 1% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
12.2MW planned

for every MW Samsung Renewable Energy operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 6.2 GW
none
Solar 2.3 GW
700 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage386.2 GW00 MW
Solar152.3 GW3700 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed2.2 GW, 26%
17 of 53 planned projects (32%)
Under construction215.2 MW, 3%
3 of 53 planned projects (6%)
Past due283.9 MW, 3%
2 of 53 planned projects (4%)
3% of Samsung Renewable Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Samsung Renewable Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02k4k6k Snapshot year 2025 316.6 MW 2026 2027 4.5 GW 2028 2029
View as table
YearProjectsMW
20252283.9 MW
20264316.6 MW
2027182.8 GW
2028234.5 GW
20296692.8 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Samsung Renewable Energy's planned MW leans on ERCOT, Midcontinent ISO (MISO) and PJM Interconnection. ERCOT alone holds 88% of it.

Figure 2

Planned MW by grid operator

53 planned projects

ERCOT 7.5 GW 46 projects
Midcontinent ISO (MISO) 600 MW 3 projects
PJM Interconnection 200 MW 2 projects
Southern Company 150 MW 1 project
Southwest Power Pool (SPP) 100 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT467.5 GW
Midcontinent ISO (MISO)3600 MW
PJM Interconnection2200 MW
Southern Company1150 MW
Southwest Power Pool (SPP)1100 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2022 was the biggest year.

01k2k3k 2019 2020 2021 2.3 GW 2022 2023 2024 2025
View as table
Queue yearProjectsMW
20191200 MW
20201200 MW
20212111.2 MW
2022172.3 GW
20234531.6 MW
2024112.2 GW
202551.5 GW
Source. 12 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Samsung Renewable Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
4
cancelled, inactive or dropped
19
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Samsung Renewable EnergyChange: any 30 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
30 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Samsung Renewable Energy's pipeline moves.

Request access

Samsung Renewable Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Samsung Renewable Energy ranks 18 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
18 Samsung Renewable Energy this page 53
8.5 GW
3
700 MW
0.08

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Samsung Renewable Energy

Every Samsung Renewable Energy project

All 56 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Samsung Renewable EnergySort: MW, largest first 56 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
56 projects and 9.2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Samsung Renewable Energy

We email you when Samsung Renewable Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Samsung Renewable Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.