Salka Energy

Power developer5 projects on record Data as of

Salka Energy has 5 planned power projects totaling 215.8 MW in the FieldProspects database and no operating project on record. 39% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 6 contacts at the company are on file.

215.8MW
planned, 5 projects
0MW
operating, 0 projects
84.3MW
interconnection agreement signed, 39% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
6
contacts on file
Map

Where Salka Energy's planned pipeline sits

Planned MW by state. Everything sits in California.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California215.8 MW5 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
215.8 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Wind 215.8 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind5215.8 MW00 MW

MW by technologyWind has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed84.3 MW, 39%
1 of 5 planned projects (20%)
Under construction0 MW, 0%
0 of 5 planned projects (0%)
Past due0 MW, 0%
0 of 5 planned projects (0%)
0% of Salka Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Salka Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300 Snapshot year 2026 215.8 MW 2027
View as table
YearProjectsMW
202600 MW
20275215.8 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Salka Energy's planned MW sits entirely in California ISO (CAISO).

Figure 2

Planned MW by grid operator

5 planned projects

California ISO (CAISO) 215.8 MW 5 projects
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)5215.8 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2017 was the biggest year.

0255075100 84.3 MW 2017
View as table
Queue yearProjectsMW
2017184.3 MW
Source. 4 projects without a queue date are left out MW

Salka Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Salka Energy ranks 457 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
457 Salka Energy this page 5
215.8 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Salka Energy

6 people at Salka Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 managers and 3 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

6 contacts

C-Suite 1
Director 3
Manager 2
View as table
SeniorityContacts
C-Suite1
Director3
Manager2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 6 contacts
PersonTitleDepartmentSeniorityContact
6 contacts at Salka Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Salka Energy project

All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Salka EnergySort: MW, largest first 5 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
5 projects and 215.8 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 6 contacts.

Request access

Get alerts for Salka Energy

We email you when Salka Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Salka Energy project and the 6 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.