FieldProspects

rPlus Energies

Power developer5 projects on record Data as of

rPlus Energies has 1 planned power project totaling 400 MW and 4 operating projects totaling 1.5 GW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 26 contacts at the company are on file.

400MW
planned, 1 project
1.5GW
operating, 4 projects
400MW
interconnection agreement signed, 100% of planned
400MW
under construction, 1 project
0MW
past due, 0 projects
26
contacts on file
Map

Where rPlus Energies' planned pipeline sits

Planned MW by state. Everything sits in Idaho.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Idaho400 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.3MW planned

for every MW rPlus Energies operates today.

PlannedOperating
Solar 400 MW
1.1 GW
Battery Storage none
400 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1400 MW31.1 GW
Battery Storage00 MW1400 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed400 MW, 100%
1 of 1 planned project (100%)
Under construction400 MW, 100%
1 of 1 planned project (100%)
Past due0 MW, 0%
0 of 1 planned project (0%)
None of rPlus Energies' planned MW sits in the seven ISO queues, where 11% of planned MW is past due across all developers.

Share of rPlus Energies' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 2026 400 MW 2027
View as table
YearProjectsMW
202600 MW
20271400 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

rPlus Energies' planned MW sits entirely in Idaho Power.

Figure 2

Planned MW by grid operator

1 planned project

Idaho Power 400 MW 1 project
View as table
GridPlanned projectsPlanned MW
Idaho Power1400 MW

Changes since the June 4, 2026 snapshot

What moved in rPlus Energies' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
2
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: rPlus EnergiesChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when rPlus Energies' pipeline moves.

Request access

rPlus Energies against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. rPlus Energies ranks 337 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
337 rPlus Energies this page 1
400 MW
4
1.5 GW
3.63

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus rPlus Energies

26 people at rPlus Energies

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 6 managers and 13 directors are where interconnection and procurement decisions start.

Figure 3

By seniority

26 contacts

C-Suite 1
Founder 1
VP 2
Director 13
Manager 6
Senior 3
View as table
SeniorityContacts
C-Suite1
Founder1
VP2
Director13
Manager6
Senior3
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 26 contacts
PersonTitleDepartmentSeniorityContact
26 contacts at rPlus Energies for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every rPlus Energies project

All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: rPlus EnergiesSort: MW, largest first 5 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
5 projects and 1.9 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 26 contacts.

Request access

Get alerts for rPlus Energies

We email you when rPlus Energies adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every rPlus Energies project and the 26 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.