RIC Energy

Power developer27 projects on record Data as of

RIC Energy has 24 planned power projects totaling 3.2 GW and 3 operating projects totaling 11.7 MW in the FieldProspects database. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 29 contacts at the company are on file.

3.2GW
planned, 24 projects
11.7MW
operating, 3 projects
10MW
interconnection agreement signed, 0% of planned
10MW
under construction, 2 projects
0MW
past due, 0 projects
29
contacts on file
Map

Where RIC Energy's planned pipeline sits

Planned MW by state. The 2 largest states hold 3.2 GW of the 3.2 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas3.2 GW22 projects, 100% of planned
  2. New York10 MW2 projects, 0% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
274.2MW planned

for every MW RIC Energy operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 2.5 GW
none
Solar 692.1 MW
11.7 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage152.5 GW00 MW
Solar9692.1 MW311.7 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed10 MW, 0%
2 of 24 planned projects (8%)
Under construction10 MW, 0%
2 of 24 planned projects (8%)
Past due0 MW, 0%
0 of 24 planned projects (0%)
0% of RIC Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of RIC Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
01k2k3k Snapshot year 10 MW 2026 2027 2 GW 2028 2029 2030
View as table
YearProjectsMW
2026210 MW
20272386.2 MW
2028142 GW
20294445.6 MW
20302330.9 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

RIC Energy's planned MW leans on ERCOT and New York ISO (NYISO). ERCOT alone holds 100% of it.

Figure 2

Planned MW by grid operator

24 planned projects

ERCOT 3.2 GW 22 projects
New York ISO (NYISO) 10 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT223.2 GW
New York ISO (NYISO)210 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2024 was the biggest year.

0200400600800 2023 757 MW 2024 2025
View as table
Queue yearProjectsMW
20232256.3 MW
20245757 MW
20253434 MW
Source. 14 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in RIC Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
1
cancelled, inactive or dropped
5
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: RIC EnergyChange: any 6 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
6 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when RIC Energy's pipeline moves.

Request access

RIC Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. RIC Energy ranks 48 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
48 RIC Energy this page 24
3.2 GW
3
11.7 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus RIC Energy

29 people at RIC Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 16 managers and 12 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

29 contacts

C-Suite 1
Director 12
Manager 16
View as table
SeniorityContacts
C-Suite1
Director12
Manager16
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 29 contacts
PersonTitleDepartmentSeniorityContact
29 contacts at RIC Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every RIC Energy project

All 27 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: RIC EnergySort: MW, largest first 27 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
27 projects and 3.2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 29 contacts.

Request access

Get alerts for RIC Energy

We email you when RIC Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every RIC Energy project and the 29 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.