Rhynland Energy

Power developer3 projects on record Data as of

Rhynland Energy has 3 planned power projects totaling 319.9 MW in the FieldProspects database and no operating project on record. 44% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 2 states and 1 technology.

319.9MW
planned, 3 projects
0MW
operating, 0 projects
139.9MW
interconnection agreement signed, 44% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
2
states
Map

Where Rhynland Energy's planned pipeline sits

Planned MW by state. The 2 largest states hold 319.9 MW of the 319.9 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Massachusetts180 MW1 project, 56% of planned
  2. New York139.9 MW2 projects, 44% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
319.9 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 319.9 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage3319.9 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed139.9 MW, 44%
2 of 3 planned projects (67%)
Under construction0 MW, 0%
0 of 3 planned projects (0%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of Rhynland Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Rhynland Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 2026 2027 180 MW 2028
View as table
YearProjectsMW
202600 MW
20272139.9 MW
20281180 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Rhynland Energy's planned MW leans on ISO New England and New York ISO (NYISO). ISO New England alone holds 56% of it.

Figure 2

Planned MW by grid operator

3 planned projects

ISO New England 180 MW 1 project
New York ISO (NYISO) 139.9 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ISO New England1180 MW
New York ISO (NYISO)2139.9 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2024 was the biggest year.

050100150200 2021 2022 2023 180 MW 2024
View as table
Queue yearProjectsMW
20212139.9 MW
202200 MW
202300 MW
20241180 MW
Source. Every planned project has a queue date MW

Rhynland Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Rhynland Energy ranks 366 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
366 Rhynland Energy this page 3
319.9 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Rhynland Energy

Every Rhynland Energy project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Rhynland EnergySort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 319.9 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Rhynland Energy

We email you when Rhynland Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Rhynland Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.