FieldProspects

Rewild Renewables

Power developer17 projects on record Data as of

Rewild Renewables has 17 planned power projects totaling 65.5 MW in the FieldProspects database and no operating project on record. 12% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 5 contacts at the company are on file.

65.5MW
planned, 17 projects
0MW
operating, 0 projects
8MW
interconnection agreement signed, 12% of planned
8MW
under construction, 2 projects
0MW
past due, 0 projects
5
contacts on file
Map

Where Rewild Renewables' planned pipeline sits

Planned MW by state. The 2 largest states hold 65.5 MW of the 65.5 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Massachusetts51 MW13 projects, 78% of planned
  2. Delaware14.5 MW4 projects, 22% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
65.5 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 47.5 MW
none
Battery Storage 18 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1247.5 MW00 MW
Battery Storage518 MW00 MW

MW by technologySolar and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed8 MW, 12%
2 of 17 planned projects (12%)
Under construction8 MW, 12%
2 of 17 planned projects (12%)
Past due0 MW, 0%
0 of 17 planned projects (0%)
0% of Rewild Renewables' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Rewild Renewables' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0204060 Snapshot year 8 MW 2026 57.5 MW 2027
View as table
YearProjectsMW
202628 MW
20271557.5 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Rewild Renewables' planned MW leans on ISO New England and PJM Interconnection. ISO New England alone holds 78% of it.

Figure 2

Planned MW by grid operator

17 planned projects

ISO New England 51 MW 13 projects
PJM Interconnection 14.5 MW 4 projects
View as table
GridPlanned projectsPlanned MW
ISO New England1351 MW
PJM Interconnection414.5 MW
Source. Balancing authorities as listed in the queue

Changes since the June 4, 2026 snapshot

What moved in Rewild Renewables' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+3
projects added, 15 MW
0
came online
0
cancelled, inactive or dropped
12
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Rewild RenewablesChange: any 15 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
15 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Rewild Renewables' pipeline moves.

Request access

Rewild Renewables against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Rewild Renewables ranks 665 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
665 Rewild Renewables this page 17
65.5 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Rewild Renewables

5 people at Rewild Renewables

Contacts with title, seniority, department, email and LinkedIn, counted here and never named.

Figure 3

By seniority

5 contacts

Founder 1
Partner 1
VP 3
View as table
SeniorityContacts
Founder1
Partner1
VP3
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 5 contacts
PersonTitleDepartmentSeniorityContact
5 contacts at Rewild Renewables for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Rewild Renewables project

All 17 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Rewild RenewablesSort: MW, largest first 17 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
17 projects and 65.5 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 5 contacts.

Request access

Get alerts for Rewild Renewables

We email you when Rewild Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Rewild Renewables project and the 5 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.