FieldProspects

REV Renewables

Power developer22 projects on record Data as of

REV Renewables has 18 planned power projects totaling 3 GW and 4 operating projects totaling 164.8 MW in the FieldProspects database. 86% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 75 contacts at the company are on file.

3GW
planned, 18 projects
164.8MW
operating, 4 projects
2.6GW
interconnection agreement signed, 86% of planned
304MW
under construction, 4 projects
0MW
past due, 0 projects
75
contacts on file
Map

Where REV Renewables' planned pipeline sits

Planned MW by state. The 6 largest states hold 2.6 GW of the 3 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California625 MW3 projects, 21% of planned
  2. Nevada512.6 MW2 projects, 17% of planned
  3. New Jersey450 MW3 projects, 15% of planned
  4. Virginia393 MW3 projects, 13% of planned
  5. Missouri300 MW2 projects, 10% of planned
  6. Maryland300 MW1 project, 10% of planned

3 more states with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
18.2MW planned

for every MW REV Renewables operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 2.1 GW
125 MW
Solar 611 MW
39.8 MW
Solar + Storage (Hybrid) 300 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage112.1 GW2125 MW
Solar6611 MW239.8 MW
Solar + Storage (Hybrid)1300 MW00 MW

MW by technologySolar + Storage (Hybrid) has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed2.6 GW, 86%
16 of 18 planned projects (89%)
Under construction304 MW, 10%
4 of 18 planned projects (22%)
Past due0 MW, 0%
0 of 18 planned projects (0%)
0% of REV Renewables' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of REV Renewables' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 2026 2027 1.5 GW 2028 2029 2030 2031 2032
View as table
YearProjectsMW
202600 MW
20277939.3 MW
202881.5 GW
202900 MW
20302456.3 MW
203100 MW
20321125 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

REV Renewables' planned MW leans on PJM Interconnection, California ISO (CAISO) and Southwest Power Pool (SPP). PJM Interconnection alone holds 52% of it.

Figure 2

Planned MW by grid operator

18 planned projects

PJM Interconnection 1.6 GW 11 projects
California ISO (CAISO) 1.1 GW 5 projects
Southwest Power Pool (SPP) 300 MW 2 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection111.6 GW
California ISO (CAISO)51.1 GW
Southwest Power Pool (SPP)2300 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

05001k1.5k 2015 2016 2017 2018 2019 1.2 GW 2020 2021 2022 2023
View as table
Queue yearProjectsMW
20151125 MW
201600 MW
2017180 MW
2018186 MW
20196929 MW
202061.2 GW
20211256.3 MW
202200 MW
20232300 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in REV Renewables' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
3
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: REV RenewablesChange: any 8 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
8 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when REV Renewables' pipeline moves.

Request access

REV Renewables against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. REV Renewables ranks 53 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
53 REV Renewables this page 18
3 GW
4
164.8 MW
0.05

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus REV Renewables

75 people at REV Renewables

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 35 managers and 15 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

75 contacts

C-Suite 3
Owner 1
Head 2
VP 13
Director 15
Manager 35
Senior 6
View as table
SeniorityContacts
C-Suite3
Owner1
Head2
VP13
Director15
Manager35
Senior6
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 75 contacts
PersonTitleDepartmentSeniorityContact
75 contacts at REV Renewables for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every REV Renewables project

All 22 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: REV RenewablesSort: MW, largest first 22 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
22 projects and 3.2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 75 contacts.

Request access

Get alerts for REV Renewables

We email you when REV Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every REV Renewables project and the 75 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.