Power developer9 projects on record Data as of

RES has 9 planned power projects totaling 1 GW in the FieldProspects database and no operating project on record. 90% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 244 contacts at the company are on file.

1GW
planned, 9 projects
0MW
operating, 0 projects
940.5MW
interconnection agreement signed, 90% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
244
contacts on file
Map

Where RES's planned pipeline sits

Planned MW by state. The 3 largest states hold 1 GW of the 1 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas705.5 MW6 projects, 68% of planned
  2. Oklahoma255 MW2 projects, 25% of planned
  3. Missouri80 MW1 project, 8% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 401.7 MW
none
Solar + Storage (Hybrid) 335 MW
none
Battery Storage 303.8 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar2401.7 MW00 MW
Solar + Storage (Hybrid)3335 MW00 MW
Battery Storage4303.8 MW00 MW

MW by technology3 technologies have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed940.5 MW, 90%
8 of 9 planned projects (89%)
Under construction0 MW, 0%
0 of 9 planned projects (0%)
Past due0 MW, 0%
0 of 9 planned projects (0%)
0% of RES's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of RES's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2026 2027 501.7 MW 2028 2029
View as table
YearProjectsMW
202600 MW
20273458.8 MW
20285501.7 MW
2029180 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

RES's planned MW leans on ERCOT and Southwest Power Pool (SPP). ERCOT alone holds 68% of it.

Figure 2

Planned MW by grid operator

9 planned projects

ERCOT 705.5 MW 6 projects
Southwest Power Pool (SPP) 335 MW 3 projects
View as table
GridPlanned projectsPlanned MW
ERCOT6705.5 MW
Southwest Power Pool (SPP)3335 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2021 was the biggest year.

0200400600800 656.7 MW 2021 2022 2023
View as table
Queue yearProjectsMW
20216656.7 MW
20221203.8 MW
2023180 MW
Source. 1 project without a queue date is left out MW

RES against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. RES ranks 162 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
162 RES this page 9
1 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus RES

244 people at RES

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 156 managers and 41 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

244 contacts

C-Suite 7
Founder 1
Partner 6
VP 12
Director 41
Manager 156
Senior 21
View as table
SeniorityContacts
C-Suite7
Founder1
Partner6
VP12
Director41
Manager156
Senior21
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 244 contacts
PersonTitleDepartmentSeniorityContact
244 contacts at RES for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every RES project

All 9 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: RESSort: MW, largest first 9 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
9 projects and 1 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 244 contacts.

Request access

Get alerts for RES

We email you when RES adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every RES project and the 244 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.