RES has 9 planned power projects totaling 1 GW in the FieldProspects database and no operating project on record. 90% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 244 contacts at the company are on file.
Where RES's planned pipeline sits
Planned MW by state. The 3 largest states hold 1 GW of the 1 GW.
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 2 | 401.7 MW | 0 | 0 MW |
| Solar + Storage (Hybrid) | 3 | 335 MW | 0 | 0 MW |
| Battery Storage | 4 | 303.8 MW | 0 | 0 MW |
MW by technology3 technologies have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of RES's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 3 | 458.8 MW |
| 2028 | 5 | 501.7 MW |
| 2029 | 1 | 80 MW |
Pipeline by grid and queue year
RES's planned MW leans on ERCOT and Southwest Power Pool (SPP). ERCOT alone holds 68% of it.
Planned MW by grid operator
9 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 6 | 705.5 MW |
| Southwest Power Pool (SPP) | 3 | 335 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2021 | 6 | 656.7 MW |
| 2022 | 1 | 203.8 MW |
| 2023 | 1 | 80 MW |
RES against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. RES ranks 162 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 162 | RES this page | 9 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus RES244 people at RES
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 156 managers and 41 directors are where interconnection and procurement decisions start.
By seniority
244 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 7 |
| Founder | 1 |
| Partner | 6 |
| VP | 12 |
| Director | 41 |
| Manager | 156 |
| Senior | 21 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every RES project
All 9 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 244 contacts.
Get alerts for RES
We email you when RES adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every RES project and the 244 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.