Power developer8 projects on record Data as of

Repsol has 7 planned power projects totaling 1.6 GW and 1 operating project totaling 650 MW in the FieldProspects database. 75% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 289 contacts at the company are on file.

1.6GW
planned, 7 projects
650MW
operating, 1 project
1.2GW
interconnection agreement signed, 75% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
289
contacts on file
Map

Where Repsol's planned pipeline sits

Planned MW by state. The 4 largest states hold 1.6 GW of the 1.6 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Ohio604 MW3 projects, 37% of planned
  2. New York520 MW2 projects, 32% of planned
  3. Texas324.1 MW1 project, 20% of planned
  4. Illinois200 MW1 project, 12% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2.5MW planned

for every MW Repsol operates today. Solar + Storage (Hybrid) is most of the gap.

PlannedOperating
Solar 928.1 MW
650 MW
Solar + Storage (Hybrid) 520 MW
none
Wind 200 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar4928.1 MW1650 MW
Solar + Storage (Hybrid)2520 MW00 MW
Wind1200 MW00 MW

MW by technologySolar + Storage (Hybrid) and Wind have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.2 GW, 75%
5 of 7 planned projects (71%)
Under construction0 MW, 0%
0 of 7 planned projects (0%)
Past due0 MW, 0%
0 of 7 planned projects (0%)
0% of Repsol's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Repsol's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600800 Snapshot year 200 MW 2026 793.1 MW 2027 2028
View as table
YearProjectsMW
20261200 MW
20273793.1 MW
20283655 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Repsol's planned MW leans on PJM Interconnection, New York ISO (NYISO) and ERCOT. PJM Interconnection alone holds 37% of it.

Figure 2

Planned MW by grid operator

7 planned projects

PJM Interconnection 604 MW 3 projects
New York ISO (NYISO) 520 MW 2 projects
ERCOT 324.1 MW 1 project
Midcontinent ISO (MISO) 200 MW 1 project
View as table
GridPlanned projectsPlanned MW
PJM Interconnection3604 MW
New York ISO (NYISO)2520 MW
ERCOT1324.1 MW
Midcontinent ISO (MISO)1200 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

0200400600 2018 523.1 MW 2019 2020
View as table
Queue yearProjectsMW
20181270 MW
20192523.1 MW
20202450 MW
Source. 2 projects without a queue date are left out MW

Repsol against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Repsol ranks 101 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
101 Repsol this page 7
1.6 GW
1
650 MW
0.39

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Repsol

289 people at Repsol

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 130 managers and 18 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

289 contacts

C-Suite 2
Owner 2
Partner 4
Head 9
VP 7
Director 18
Manager 130
Senior 117
View as table
SeniorityContacts
C-Suite2
Owner2
Partner4
Head9
VP7
Director18
Manager130
Senior117
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 289 contacts
PersonTitleDepartmentSeniorityContact
289 contacts at Repsol for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Repsol project

All 8 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: RepsolSort: MW, largest first 8 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
8 projects and 2.3 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 289 contacts.

Request access

Get alerts for Repsol

We email you when Repsol adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Repsol project and the 289 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.