Repsol
Repsol has 7 planned power projects totaling 1.6 GW and 1 operating project totaling 650 MW in the FieldProspects database. 75% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 289 contacts at the company are on file.
Where Repsol's planned pipeline sits
Planned MW by state. The 4 largest states hold 1.6 GW of the 1.6 GW.
for every MW Repsol operates today. Solar + Storage (Hybrid) is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 4 | 928.1 MW | 1 | 650 MW |
| Solar + Storage (Hybrid) | 2 | 520 MW | 0 | 0 MW |
| Wind | 1 | 200 MW | 0 | 0 MW |
MW by technologySolar + Storage (Hybrid) and Wind have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Repsol's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 200 MW |
| 2027 | 3 | 793.1 MW |
| 2028 | 3 | 655 MW |
Pipeline by grid and queue year
Repsol's planned MW leans on PJM Interconnection, New York ISO (NYISO) and ERCOT. PJM Interconnection alone holds 37% of it.
Planned MW by grid operator
7 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 3 | 604 MW |
| New York ISO (NYISO) | 2 | 520 MW |
| ERCOT | 1 | 324.1 MW |
| Midcontinent ISO (MISO) | 1 | 200 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2018 | 1 | 270 MW |
| 2019 | 2 | 523.1 MW |
| 2020 | 2 | 450 MW |
Repsol against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Repsol ranks 101 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 101 | Repsol this page | 7 | 1 | 0.39 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Repsol289 people at Repsol
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 130 managers and 18 directors are where interconnection and procurement decisions start.
By seniority
289 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Owner | 2 |
| Partner | 4 |
| Head | 9 |
| VP | 7 |
| Director | 18 |
| Manager | 130 |
| Senior | 117 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Repsol project
All 8 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 289 contacts.
Get alerts for Repsol
We email you when Repsol adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Repsol project and the 289 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.