FieldProspects

Renesola Power

Power developer4 projects on record Data as of

Renesola Power has 4 planned power projects totaling 77.6 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 2 states and 2 technologies.

77.6MW
planned, 4 projects
0MW
operating, 0 projects
77.6MW
interconnection agreement signed, 100% of planned
57.7MW
under construction, 3 projects
0MW
past due, 0 projects
2
states
Map

Where Renesola Power's planned pipeline sits

Planned MW by state. The 2 largest states hold 77.6 MW of the 77.6 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Pennsylvania57.7 MW3 projects, 74% of planned
  2. Illinois19.9 MW1 project, 26% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
77.6 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 57.7 MW
none
Solar + Storage (Hybrid) 19.9 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar357.7 MW00 MW
Solar + Storage (Hybrid)119.9 MW00 MW

MW by technologySolar and Solar + Storage (Hybrid) have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed77.6 MW, 100%
4 of 4 planned projects (100%)
Under construction57.7 MW, 74%
3 of 4 planned projects (75%)
Past due0 MW, 0%
0 of 4 planned projects (0%)
0% of Renesola Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Renesola Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
010203040 Snapshot year 37.8 MW 2026 39.8 MW 2027
View as table
YearProjectsMW
2026237.8 MW
2027239.8 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Renesola Power's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

4 planned projects

PJM Interconnection 77.6 MW 4 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection477.6 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2018 was the biggest year.

010203040 39.8 MW 2018 2019 2020
View as table
Queue yearProjectsMW
2018239.8 MW
2019117.9 MW
2020119.9 MW
Source. Every planned project has a queue date MW

Renesola Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Renesola Power ranks 654 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
654 Renesola Power this page 4
77.6 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Renesola Power

Every Renesola Power project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Renesola PowerSort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 77.6 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Renesola Power

We email you when Renesola Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Renesola Power project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.