Recurrent Energy
Recurrent Energy has 15 planned power projects totaling 2.6 GW and 6 operating projects totaling 880.6 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 89 contacts at the company are on file.
Where Recurrent Energy's planned pipeline sits
Planned MW by state. The 6 largest states hold 2.6 GW of the 2.6 GW.
for every MW Recurrent Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 9 | 1.6 GW | 4 | 478 MW |
| Battery Storage | 5 | 917.8 MW | 2 | 402.6 MW |
| Solar + Storage (Hybrid) | 1 | 100 MW | 0 | 0 MW |
MW by technologySolar + Storage (Hybrid) has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Recurrent Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 6 | 576.6 MW |
| 2027 | 6 | 1.5 GW |
| 2028 | 2 | 271 MW |
| 2029 | 1 | 250 MW |
Pipeline by grid and queue year
Recurrent Energy's planned MW leans on California ISO (CAISO), ERCOT and PJM Interconnection. California ISO (CAISO) alone holds 56% of it.
Planned MW by grid operator
15 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 6 | 1.4 GW |
| ERCOT | 3 | 521 MW |
| PJM Interconnection | 4 | 386 MW |
| Douglas County PUD | 1 | 150 MW |
| Midcontinent ISO (MISO) | 1 | 100 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2014 | 2 | 186.6 MW |
| 2015 | 2 | 750 MW |
| 2016 | 0 | 0 MW |
| 2017 | 2 | 246 MW |
| 2018 | 1 | 70 MW |
| 2019 | 0 | 0 MW |
| 2020 | 3 | 762.6 MW |
| 2021 | 2 | 271 MW |
| 2022 | 1 | 100 MW |
Changes since the June 4, 2026 snapshot
What moved in Recurrent Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Recurrent Energy's pipeline moves.
Recurrent Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Recurrent Energy ranks 59 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 59 | Recurrent Energy this page | 15 | 6 | 0.34 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Recurrent Energy89 people at Recurrent Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 48 managers and 21 directors are where interconnection and procurement decisions start.
By seniority
89 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| Head | 4 |
| VP | 2 |
| Director | 21 |
| Manager | 48 |
| Senior | 13 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Recurrent Energy project
All 21 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 89 contacts.
Get alerts for Recurrent Energy
We email you when Recurrent Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Recurrent Energy project and the 89 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.