Ranger Power

Power developer29 projects on record Data as of

Ranger Power has 27 planned power projects totaling 5 GW and 2 operating projects totaling 348 MW in the FieldProspects database. 97% of the planned capacity has an interconnection agreement and 45% is past its listed in-service date. 31 contacts at the company are on file.

5GW
planned, 27 projects
348MW
operating, 2 projects
4.8GW
interconnection agreement signed, 97% of planned
1.6GW
under construction, 8 projects
2.2GW
past due, 13 projects
31
contacts on file
Map

Where Ranger Power's planned pipeline sits

Planned MW by state. The 6 largest states hold 4.4 GW of the 5 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Missouri1.4 GW5 projects, 29% of planned
  2. Michigan1.4 GW8 projects, 27% of planned
  3. Indiana599 MW3 projects, 12% of planned
  4. Wisconsin448 MW3 projects, 9% of planned
  5. Nebraska300 MW2 projects, 6% of planned
  6. Illinois299 MW3 projects, 6% of planned

3 more states with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
14.4MW planned

for every MW Ranger Power operates today. Solar is most of the gap.

PlannedOperating
Solar 4.7 GW
348 MW
Solar + Storage (Hybrid) 200 MW
none
Battery Storage 75 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar254.7 GW2348 MW
Solar + Storage (Hybrid)1200 MW00 MW
Battery Storage175 MW00 MW

MW by technologySolar + Storage (Hybrid) and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed4.8 GW, 97%
26 of 27 planned projects (96%)
Under construction1.6 GW, 33%
8 of 27 planned projects (30%)
Past due2.2 GW, 45%
13 of 27 planned projects (48%)
51% of Ranger Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Ranger Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 2020 2021 2022 2023 2024 2025 850 MW 2026 1.2 GW 2027 2028 2029
View as table
YearProjectsMW
2020199 MW
20212328 MW
20223498 MW
202300 MW
20243650 MW
20254670 MW
20265850 MW
202751.2 GW
202800 MW
20294650 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Ranger Power's planned MW leans on Midcontinent ISO (MISO), Southwest Power Pool (SPP) and Southwestern Power Administration. Midcontinent ISO (MISO) alone holds 71% of it.

Figure 2

Planned MW by grid operator

27 planned projects

Midcontinent ISO (MISO) 3.5 GW 21 projects
Southwest Power Pool (SPP) 700 MW 3 projects
Southwestern Power Administration 400 MW 1 project
PJM Interconnection 200 MW 1 project
Southern Company 150 MW 1 project
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)213.5 GW
Southwest Power Pool (SPP)3700 MW
Southwestern Power Administration1400 MW
PJM Interconnection1200 MW
Southern Company1150 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2017 was the biggest year.

05001k1.5k 1.2 GW 2017 2018 2019 2020 2021 2022 2023 2024 2025
View as table
Queue yearProjectsMW
201761.2 GW
20182400 MW
20195890 MW
20204600 MW
20213500 MW
202200 MW
202300 MW
202400 MW
20251180 MW
Source. 6 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Ranger Power's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Ranger PowerChange: any 6 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
6 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Ranger Power's pipeline moves.

Request access

Ranger Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Ranger Power ranks 33 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
33 Ranger Power this page 27
5 GW
2
348 MW
0.07

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Ranger Power

31 people at Ranger Power

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 18 managers and 2 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

31 contacts

C-Suite 2
VP 5
Director 2
Manager 18
Senior 3
Unknown 1
View as table
SeniorityContacts
C-Suite2
VP5
Director2
Manager18
Senior3
Unknown1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 31 contacts
PersonTitleDepartmentSeniorityContact
31 contacts at Ranger Power for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Ranger Power project

All 29 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Ranger PowerSort: MW, largest first 29 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
29 projects and 5.3 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 31 contacts.

Request access

Get alerts for Ranger Power

We email you when Ranger Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Ranger Power project and the 31 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.