Ranger Power
Ranger Power has 27 planned power projects totaling 5 GW and 2 operating projects totaling 348 MW in the FieldProspects database. 97% of the planned capacity has an interconnection agreement and 45% is past its listed in-service date. 31 contacts at the company are on file.
Where Ranger Power's planned pipeline sits
Planned MW by state. The 6 largest states hold 4.4 GW of the 5 GW.
for every MW Ranger Power operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 25 | 4.7 GW | 2 | 348 MW |
| Solar + Storage (Hybrid) | 1 | 200 MW | 0 | 0 MW |
| Battery Storage | 1 | 75 MW | 0 | 0 MW |
MW by technologySolar + Storage (Hybrid) and Battery Storage have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Ranger Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2020 | 1 | 99 MW |
| 2021 | 2 | 328 MW |
| 2022 | 3 | 498 MW |
| 2023 | 0 | 0 MW |
| 2024 | 3 | 650 MW |
| 2025 | 4 | 670 MW |
| 2026 | 5 | 850 MW |
| 2027 | 5 | 1.2 GW |
| 2028 | 0 | 0 MW |
| 2029 | 4 | 650 MW |
Pipeline by grid and queue year
Ranger Power's planned MW leans on Midcontinent ISO (MISO), Southwest Power Pool (SPP) and Southwestern Power Administration. Midcontinent ISO (MISO) alone holds 71% of it.
Planned MW by grid operator
27 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 21 | 3.5 GW |
| Southwest Power Pool (SPP) | 3 | 700 MW |
| Southwestern Power Administration | 1 | 400 MW |
| PJM Interconnection | 1 | 200 MW |
| Southern Company | 1 | 150 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2017 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 6 | 1.2 GW |
| 2018 | 2 | 400 MW |
| 2019 | 5 | 890 MW |
| 2020 | 4 | 600 MW |
| 2021 | 3 | 500 MW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 0 | 0 MW |
| 2025 | 1 | 180 MW |
Changes since the June 4, 2026 snapshot
What moved in Ranger Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Ranger Power's pipeline moves.
Ranger Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Ranger Power ranks 33 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 33 | Ranger Power this page | 27 | 2 | 0.07 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Ranger Power31 people at Ranger Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 18 managers and 2 directors are where interconnection and procurement decisions start.
By seniority
31 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| VP | 5 |
| Director | 2 |
| Manager | 18 |
| Senior | 3 |
| Unknown | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Ranger Power project
All 29 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 31 contacts.
Get alerts for Ranger Power
We email you when Ranger Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Ranger Power project and the 31 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.