Power developer5 projects on record Data as of

Prospect14 has 5 planned power projects totaling 385 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 2 technologies.

385MW
planned, 5 projects
0MW
operating, 0 projects
385MW
interconnection agreement signed, 100% of planned
20MW
under construction, 1 project
0MW
past due, 0 projects
1
state
Map

Where Prospect14's planned pipeline sits

Planned MW by state. Everything sits in Pennsylvania.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Pennsylvania385 MW5 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
385 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 290 MW
none
Solar + Storage (Hybrid) 95 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar4290 MW00 MW
Solar + Storage (Hybrid)195 MW00 MW

MW by technologySolar and Solar + Storage (Hybrid) have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed385 MW, 100%
5 of 5 planned projects (100%)
Under construction20 MW, 5%
1 of 5 planned projects (20%)
Past due0 MW, 0%
0 of 5 planned projects (0%)
0% of Prospect14's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Prospect14's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 2026 2027 2028 345 MW 2029
View as table
YearProjectsMW
202600 MW
2027240 MW
202800 MW
20293345 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Prospect14's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

5 planned projects

PJM Interconnection 385 MW 5 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection5385 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

0100200300400 2019 345 MW 2020
View as table
Queue yearProjectsMW
2019240 MW
20203345 MW
Source. Every planned project has a queue date MW

Prospect14 against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Prospect14 ranks 341 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
341 Prospect14 this page 5
385 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Prospect14

Every Prospect14 project

All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Prospect14Sort: MW, largest first 5 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
5 projects and 385 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Prospect14

We email you when Prospect14 adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Prospect14 project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.