FieldProspects

Prologis Logistics Services

Power developer69 projects on record Data as of

Prologis Logistics Services has 34 planned power projects totaling 63.4 MW and 35 operating projects totaling 524.6 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 6 states and 2 technologies.

63.4MW
planned, 34 projects
524.6MW
operating, 35 projects
63.4MW
interconnection agreement signed, 100% of planned
55.1MW
under construction, 28 projects
0MW
past due, 0 projects
6
states
Map

Where Prologis Logistics Services' planned pipeline sits

Planned MW by state. The 4 largest states hold 63.4 MW of the 63.4 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Illinois37.3 MW24 projects, 59% of planned
  2. California13 MW8 projects, 21% of planned
  3. Texas9.9 MW1 project, 16% of planned
  4. New Jersey3.2 MW1 project, 5% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.1MW planned

for every MW Prologis Logistics Services operates today. Solar is most of the gap.

PlannedOperating
Solar 50.1 MW
32.7 MW
Battery Storage 13.3 MW
491.9 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar3050.1 MW2332.7 MW
Battery Storage413.3 MW12491.9 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed63.4 MW, 100%
34 of 34 planned projects (100%)
Under construction55.1 MW, 87%
28 of 34 planned projects (82%)
Past due0 MW, 0%
0 of 34 planned projects (0%)
0% of Prologis Logistics Services' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Prologis Logistics Services' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0204060 Snapshot year 49.5 MW 2026 2027
View as table
YearProjectsMW
20262449.5 MW
20271013.9 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Prologis Logistics Services' planned MW leans on PJM Interconnection, California ISO (CAISO) and ERCOT. PJM Interconnection alone holds 64% of it.

Figure 2

Planned MW by grid operator

34 planned projects

PJM Interconnection 40.5 MW 25 projects
California ISO (CAISO) 13 MW 8 projects
ERCOT 9.9 MW 1 project
View as table
GridPlanned projectsPlanned MW
PJM Interconnection2540.5 MW
California ISO (CAISO)813 MW
ERCOT19.9 MW
Source. Balancing authorities as listed in the queue

Changes since the June 4, 2026 snapshot

What moved in Prologis Logistics Services' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+4
projects added, 9.8 MW
9
came online
0
cancelled, inactive or dropped
18
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Prologis Logistics ServicesChange: any 32 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
32 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Prologis Logistics Services' pipeline moves.

Request access

Prologis Logistics Services against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Prologis Logistics Services ranks 668 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
668 Prologis Logistics Services this page 34
63.4 MW
35
524.6 MW
8.27

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Prologis Logistics Services

Every Prologis Logistics Services project

All 69 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Prologis Logistics ServicesSort: MW, largest first 69 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
69 projects and 588 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Prologis Logistics Services

We email you when Prologis Logistics Services adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Prologis Logistics Services project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.