Primergy has 7 planned power projects totaling 2.4 GW and 2 operating projects totaling 518.1 MW in the FieldProspects database. 54% of the planned capacity has an interconnection agreement and 6% is past its listed in-service date. 63 contacts at the company are on file.
Where Primergy's planned pipeline sits
Planned MW by state. The 3 largest states hold 2.4 GW of the 2.4 GW.
for every MW Primergy operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 4 | 1.4 GW | 0 | 0 MW |
| Solar | 2 | 809.2 MW | 2 | 518.1 MW |
| Solar + Storage (Hybrid) | 1 | 150 MW | 0 | 0 MW |
MW by technologyBattery Storage and Solar + Storage (Hybrid) have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Primergy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2023 | 1 | 150 MW |
| 2024 | 0 | 0 MW |
| 2025 | 0 | 0 MW |
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 6 | 2.2 GW |
Pipeline by grid and queue year
Primergy's planned MW leans on California ISO (CAISO), ERCOT and Midcontinent ISO (MISO). California ISO (CAISO) alone holds 68% of it.
Planned MW by grid operator
7 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 4 | 1.6 GW |
| ERCOT | 2 | 612.3 MW |
| Midcontinent ISO (MISO) | 1 | 150 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2020 | 3 | 967.4 MW |
| 2021 | 0 | 0 MW |
| 2022 | 1 | 306.3 MW |
Primergy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Primergy ranks 69 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 69 | Primergy this page | 7 | 2 | 0.22 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Primergy63 people at Primergy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 27 managers and 18 directors are where interconnection and procurement decisions start.
By seniority
63 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Partner | 1 |
| VP | 5 |
| Director | 18 |
| Manager | 27 |
| Senior | 9 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Primergy project
All 9 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 63 contacts.
Get alerts for Primergy
We email you when Primergy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Primergy project and the 63 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.