Power Company of Wyoming

Power developer4 projects on record Data as of

Power Company of Wyoming has 4 planned power projects totaling 3.6 GW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 1 contact at the company are on file.

3.6GW
planned, 4 projects
0MW
operating, 0 projects
3.6GW
interconnection agreement signed, 100% of planned
3.6GW
under construction, 4 projects
0MW
past due, 0 projects
1
contacts on file
Map

Where Power Company of Wyoming's planned pipeline sits

Planned MW by state. Everything sits in Wyoming.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Wyoming3.6 GW4 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
3.6 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Wind 3.6 GW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind43.6 GW00 MW

MW by technologyWind has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed3.6 GW, 100%
4 of 4 planned projects (100%)
Under construction3.6 GW, 100%
4 of 4 planned projects (100%)
Past due0 MW, 0%
0 of 4 planned projects (0%)
0% of Power Company of Wyoming's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Power Company of Wyoming's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k2k Snapshot year 2026 2027 2028 2029 2030 1.7 GW 2031 2032 2033
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
202900 MW
203000 MW
203121.7 GW
203211.3 GW
20331553.5 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Power Company of Wyoming's planned MW sits entirely in California ISO (CAISO).

Figure 2

Planned MW by grid operator

4 planned projects

California ISO (CAISO) 3.6 GW 4 projects
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)43.6 GW

Changes since the June 4, 2026 snapshot

What moved in Power Company of Wyoming's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
4
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Power Company of WyomingChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Power Company of Wyoming's pipeline moves.

Request access

Power Company of Wyoming against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Power Company of Wyoming ranks 45 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
45 Power Company of Wyoming this page 4
3.6 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Power Company of Wyoming

1 person at Power Company of Wyoming

Contacts with title, seniority, department, email and LinkedIn, counted here and never named.

Figure 3

By seniority

1 contact

VP 1
View as table
SeniorityContacts
VP1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 1 contact
PersonTitleDepartmentSeniorityContact
1 contact at Power Company of Wyoming for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Power Company of Wyoming project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Power Company of WyomingSort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 3.6 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 1 contact.

Request access

Get alerts for Power Company of Wyoming

We email you when Power Company of Wyoming adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Power Company of Wyoming project and the 1 person behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.