Plus Power
Plus Power has 3 planned power projects totaling 657 MW and 6 operating projects totaling 1.1 GW in the FieldProspects database. 77% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 91 contacts at the company are on file.
Where Plus Power's planned pipeline sits
Planned MW by state. The 3 largest states hold 657 MW of the 657 MW.
for every MW Plus Power operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 3 | 657 MW | 6 | 1.1 GW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Plus Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 1 | 207 MW |
| 2029 | 1 | 300 MW |
| 2030 | 1 | 150 MW |
Pipeline by grid and queue year
Plus Power's planned MW leans on Southwest Power Pool (SPP) and Salt River Project. Southwest Power Pool (SPP) alone holds 77% of it.
Planned MW by grid operator
3 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Southwest Power Pool (SPP) | 2 | 507 MW |
| Salt River Project | 1 | 150 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 1 | 207 MW |
| 2020 | 0 | 0 MW |
| 2021 | 1 | 300 MW |
Changes since the June 4, 2026 snapshot
What moved in Plus Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Plus Power's pipeline moves.
Plus Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Plus Power ranks 237 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 237 | Plus Power this page | 3 | 6 | 1.63 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Plus Power91 people at Plus Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 31 managers and 19 directors are where interconnection and procurement decisions start.
By seniority
91 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 7 |
| VP | 13 |
| Director | 19 |
| Manager | 31 |
| Senior | 21 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Plus Power project
All 9 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 91 contacts.
Get alerts for Plus Power
We email you when Plus Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Plus Power project and the 91 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.