Pivot Energy
Pivot Energy has 23 planned power projects totaling 64.4 MW and 45 operating projects totaling 133.5 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 130 contacts at the company are on file.
Where Pivot Energy's planned pipeline sits
Planned MW by state. The 6 largest states hold 64.4 MW of the 64.4 MW.
for every MW Pivot Energy operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 22 | 64.3 MW | 45 | 133.5 MW |
| Battery Storage | 1 | 0.1 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Pivot Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 19 | 48.4 MW |
| 2027 | 4 | 16 MW |
Pipeline by grid and queue year
Pivot Energy's planned MW leans on PJM Interconnection, Public Service Company of Colorado and Midcontinent ISO (MISO). PJM Interconnection alone holds 46% of it.
Planned MW by grid operator
23 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 10 | 29.4 MW |
| Public Service Company of Colorado | 6 | 20.7 MW |
| Midcontinent ISO (MISO) | 4 | 7 MW |
| WAPA Rocky Mountain | 1 | 5 MW |
| California ISO (CAISO) | 2 | 2.3 MW |
Changes since the June 4, 2026 snapshot
What moved in Pivot Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Pivot Energy's pipeline moves.
Pivot Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Pivot Energy ranks 666 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 666 | Pivot Energy this page | 23 | 45 | 2.07 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Pivot Energy130 people at Pivot Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 57 managers and 33 directors are where interconnection and procurement decisions start.
By seniority
130 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Owner | 2 |
| Partner | 2 |
| VP | 16 |
| Director | 33 |
| Manager | 57 |
| Senior | 16 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Pivot Energy project
All 68 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 130 contacts.
Get alerts for Pivot Energy
We email you when Pivot Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Pivot Energy project and the 130 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.