Pivot Energy

Power developer68 projects on record Data as of

Pivot Energy has 23 planned power projects totaling 64.4 MW and 45 operating projects totaling 133.5 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 130 contacts at the company are on file.

64.4MW
planned, 23 projects
133.5MW
operating, 45 projects
64.4MW
interconnection agreement signed, 100% of planned
64.4MW
under construction, 23 projects
0MW
past due, 0 projects
130
contacts on file
Map

Where Pivot Energy's planned pipeline sits

Planned MW by state. The 6 largest states hold 64.4 MW of the 64.4 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Colorado25.7 MW7 projects, 40% of planned
  2. Illinois21.9 MW7 projects, 34% of planned
  3. Maryland9.5 MW5 projects, 15% of planned
  4. Delaware4 MW1 project, 6% of planned
  5. California2.3 MW2 projects, 4% of planned
  6. Minnesota1 MW1 project, 2% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.5MW planned

for every MW Pivot Energy operates today. Battery Storage is most of the gap.

PlannedOperating
Solar 64.3 MW
133.5 MW
Battery Storage 0.1 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar2264.3 MW45133.5 MW
Battery Storage10.1 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed64.4 MW, 100%
23 of 23 planned projects (100%)
Under construction64.4 MW, 100%
23 of 23 planned projects (100%)
Past due0 MW, 0%
0 of 23 planned projects (0%)
0% of Pivot Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Pivot Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0204060 Snapshot year 48.4 MW 2026 2027
View as table
YearProjectsMW
20261948.4 MW
2027416 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Pivot Energy's planned MW leans on PJM Interconnection, Public Service Company of Colorado and Midcontinent ISO (MISO). PJM Interconnection alone holds 46% of it.

Figure 2

Planned MW by grid operator

23 planned projects

PJM Interconnection 29.4 MW 10 projects
Public Service Company of Colorado 20.7 MW 6 projects
Midcontinent ISO (MISO) 7 MW 4 projects
WAPA Rocky Mountain 5 MW 1 project
California ISO (CAISO) 2.3 MW 2 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection1029.4 MW
Public Service Company of Colorado620.7 MW
Midcontinent ISO (MISO)47 MW
WAPA Rocky Mountain15 MW
California ISO (CAISO)22.3 MW
Source. Balancing authorities as listed in the queue

Changes since the June 4, 2026 snapshot

What moved in Pivot Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+18
projects added, 52.8 MW
0
came online
0
cancelled, inactive or dropped
4
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Pivot EnergyChange: any 22 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
22 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Pivot Energy's pipeline moves.

Request access

Pivot Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Pivot Energy ranks 666 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
666 Pivot Energy this page 23
64.4 MW
45
133.5 MW
2.07

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Pivot Energy

130 people at Pivot Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 57 managers and 33 directors are where interconnection and procurement decisions start.

Figure 3

By seniority

130 contacts

C-Suite 4
Owner 2
Partner 2
VP 16
Director 33
Manager 57
Senior 16
View as table
SeniorityContacts
C-Suite4
Owner2
Partner2
VP16
Director33
Manager57
Senior16
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 130 contacts
PersonTitleDepartmentSeniorityContact
130 contacts at Pivot Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Pivot Energy project

All 68 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Pivot EnergySort: MW, largest first 68 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
68 projects and 197.9 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 130 contacts.

Request access

Get alerts for Pivot Energy

We email you when Pivot Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Pivot Energy project and the 130 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.