Pine Gate Renewables
Pine Gate Renewables has 23 planned power projects totaling 5.5 GW and 8 operating projects totaling 569 MW in the FieldProspects database. 32% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 148 contacts at the company are on file.
Where Pine Gate Renewables' planned pipeline sits
Planned MW by state. The 6 largest states hold 5.5 GW of the 5.5 GW.
for every MW Pine Gate Renewables operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 19 | 4.2 GW | 8 | 569 MW |
| Battery Storage | 4 | 1.3 GW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Pine Gate Renewables' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 6 | 505.9 MW |
| 2027 | 5 | 2.7 GW |
| 2028 | 5 | 819.1 MW |
| 2029 | 6 | 1.2 GW |
| 2030 | 1 | 260 MW |
Pipeline by grid and queue year
Pine Gate Renewables' planned MW leans on ERCOT, Bonneville Power Administration and PJM Interconnection. ERCOT alone holds 46% of it.
Planned MW by grid operator
23 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 15 | 2.5 GW |
| Bonneville Power Administration | 2 | 2.4 GW |
| PJM Interconnection | 2 | 310.2 MW |
| Southwest Power Pool (SPP) | 1 | 200 MW |
| Duke Energy Carolinas | 1 | 34.9 MW |
| ISO New England | 2 | 4 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2024 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2020 | 2 | 384.7 MW |
| 2021 | 1 | 50 MW |
| 2022 | 2 | 276.2 MW |
| 2023 | 2 | 308.7 MW |
| 2024 | 5 | 1.2 GW |
| 2025 | 3 | 488.9 MW |
Changes since the June 4, 2026 snapshot
What moved in Pine Gate Renewables' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Pine Gate Renewables' pipeline moves.
Pine Gate Renewables against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Pine Gate Renewables ranks 31 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 31 | Pine Gate Renewables this page | 23 | 8 | 0.10 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Pine Gate Renewables148 people at Pine Gate Renewables
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 65 managers and 28 directors are where interconnection and procurement decisions start.
By seniority
148 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Founder | 3 |
| Head | 1 |
| VP | 29 |
| Director | 28 |
| Manager | 65 |
| Senior | 16 |
| Entry | 1 |
| Unknown | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Pine Gate Renewables project
All 31 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 148 contacts.
Get alerts for Pine Gate Renewables
We email you when Pine Gate Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Pine Gate Renewables project and the 148 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.