Pine Gate Renewables

Power developer31 projects on record Data as of

Pine Gate Renewables has 23 planned power projects totaling 5.5 GW and 8 operating projects totaling 569 MW in the FieldProspects database. 32% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 148 contacts at the company are on file.

5.5GW
planned, 23 projects
569MW
operating, 8 projects
1.8GW
interconnection agreement signed, 32% of planned
4MW
under construction, 2 projects
0MW
past due, 0 projects
148
contacts on file
Map

Where Pine Gate Renewables' planned pipeline sits

Planned MW by state. The 6 largest states hold 5.5 GW of the 5.5 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas2.5 GW15 projects, 46% of planned
  2. Oregon2.4 GW2 projects, 44% of planned
  3. Illinois260 MW1 project, 5% of planned
  4. Oklahoma200 MW1 project, 4% of planned
  5. Virginia50.2 MW1 project, 1% of planned
  6. North Carolina34.9 MW1 project, 1% of planned

1 more state with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
9.7MW planned

for every MW Pine Gate Renewables operates today. Solar is most of the gap.

PlannedOperating
Solar 4.2 GW
569 MW
Battery Storage 1.3 GW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar194.2 GW8569 MW
Battery Storage41.3 GW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.8 GW, 32%
13 of 23 planned projects (57%)
Under construction4 MW, 0%
2 of 23 planned projects (9%)
Past due0 MW, 0%
0 of 23 planned projects (0%)
0% of Pine Gate Renewables' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Pine Gate Renewables' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
01k2k3k Snapshot year 505.9 MW 2026 2.7 GW 2027 2028 2029 2030
View as table
YearProjectsMW
20266505.9 MW
202752.7 GW
20285819.1 MW
202961.2 GW
20301260 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Pine Gate Renewables' planned MW leans on ERCOT, Bonneville Power Administration and PJM Interconnection. ERCOT alone holds 46% of it.

Figure 2

Planned MW by grid operator

23 planned projects

ERCOT 2.5 GW 15 projects
Bonneville Power Administration 2.4 GW 2 projects
PJM Interconnection 310.2 MW 2 projects
Southwest Power Pool (SPP) 200 MW 1 project
Duke Energy Carolinas 34.9 MW 1 project
ISO New England 4 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT152.5 GW
Bonneville Power Administration22.4 GW
PJM Interconnection2310.2 MW
Southwest Power Pool (SPP)1200 MW
Duke Energy Carolinas134.9 MW
ISO New England24 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2024 was the biggest year.

05001k1.5k 2020 2021 2022 2023 1.2 GW 2024 2025
View as table
Queue yearProjectsMW
20202384.7 MW
2021150 MW
20222276.2 MW
20232308.7 MW
202451.2 GW
20253488.9 MW
Source. 8 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Pine Gate Renewables' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
1
cancelled, inactive or dropped
10
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Pine Gate RenewablesChange: any 12 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
12 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Pine Gate Renewables' pipeline moves.

Request access

Pine Gate Renewables against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Pine Gate Renewables ranks 31 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
31 Pine Gate Renewables this page 23
5.5 GW
8
569 MW
0.10

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Pine Gate Renewables

148 people at Pine Gate Renewables

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 65 managers and 28 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

148 contacts

C-Suite 4
Founder 3
Head 1
VP 29
Director 28
Manager 65
Senior 16
Entry 1
Unknown 1
View as table
SeniorityContacts
C-Suite4
Founder3
Head1
VP29
Director28
Manager65
Senior16
Entry1
Unknown1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 148 contacts
PersonTitleDepartmentSeniorityContact
148 contacts at Pine Gate Renewables for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Pine Gate Renewables project

All 31 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Pine Gate RenewablesSort: MW, largest first 31 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
31 projects and 6.1 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 148 contacts.

Request access

Get alerts for Pine Gate Renewables

We email you when Pine Gate Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Pine Gate Renewables project and the 148 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.