Peregrine Energy Storage

Power developer14 projects on record Data as of

Peregrine Energy Storage has 12 planned power projects totaling 2.4 GW and 2 operating projects totaling 350 MW in the FieldProspects database. 61% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 21 contacts at the company are on file.

2.4GW
planned, 12 projects
350MW
operating, 2 projects
1.5GW
interconnection agreement signed, 61% of planned
250MW
under construction, 1 project
0MW
past due, 0 projects
21
contacts on file
Map

Where Peregrine Energy Storage's planned pipeline sits

Planned MW by state. The 4 largest states hold 2.4 GW of the 2.4 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas1.5 GW7 projects, 61% of planned
  2. Oklahoma560 MW3 projects, 23% of planned
  3. Arkansas200 MW1 project, 8% of planned
  4. Missouri200 MW1 project, 8% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
7MW planned

for every MW Peregrine Energy Storage operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 2.4 GW
350 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage122.4 GW2350 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.5 GW, 61%
7 of 12 planned projects (58%)
Under construction250 MW, 10%
1 of 12 planned projects (8%)
Past due0 MW, 0%
0 of 12 planned projects (0%)
0% of Peregrine Energy Storage's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Peregrine Energy Storage's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 351.8 MW 2026 2027 2028 2029 1.4 GW 2030
View as table
YearProjectsMW
20262351.8 MW
20272513.3 MW
20281163.9 MW
202900 MW
203071.4 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Peregrine Energy Storage's planned MW leans on Southwest Power Pool (SPP) and ERCOT. Southwest Power Pool (SPP) alone holds 52% of it.

Figure 2

Planned MW by grid operator

12 planned projects

Southwest Power Pool (SPP) 1.3 GW 6 projects
ERCOT 1.2 GW 6 projects
View as table
GridPlanned projectsPlanned MW
Southwest Power Pool (SPP)61.3 GW
ERCOT61.2 GW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

05001k1.5k2k 2022 1.8 GW 2023
View as table
Queue yearProjectsMW
20222359.1 MW
202391.8 GW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in Peregrine Energy Storage's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
2
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Peregrine Energy StorageChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Peregrine Energy Storage's pipeline moves.

Request access

Peregrine Energy Storage against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Peregrine Energy Storage ranks 67 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
67 Peregrine Energy Storage this page 12
2.4 GW
2
350 MW
0.14

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Peregrine Energy Storage

21 people at Peregrine Energy Storage

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 11 managers and 6 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

21 contacts

C-Suite 1
Head 2
VP 1
Director 6
Manager 11
View as table
SeniorityContacts
C-Suite1
Head2
VP1
Director6
Manager11
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 21 contacts
PersonTitleDepartmentSeniorityContact
21 contacts at Peregrine Energy Storage for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Peregrine Energy Storage project

All 14 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Peregrine Energy StorageSort: MW, largest first 14 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
14 projects and 2.8 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 21 contacts.

Request access

Get alerts for Peregrine Energy Storage

We email you when Peregrine Energy Storage adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Peregrine Energy Storage project and the 21 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.