Peninsula Clean Energy
Peninsula Clean Energy has 2 planned power projects totaling 280 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 29 contacts at the company are on file.
Where Peninsula Clean Energy's planned pipeline sits
Planned MW by state. Everything sits in California.
Largest states
- California280 MW2 projects, 100% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 200 MW | 0 | 0 MW |
| Battery Storage | 1 | 80 MW | 0 | 0 MW |
MW by technologySolar and Battery Storage have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Peninsula Clean Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 280 MW |
Pipeline by grid and queue year
Peninsula Clean Energy's planned MW sits entirely in California ISO (CAISO).
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 2 | 280 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2011 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2011 | 2 | 280 MW |
Peninsula Clean Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Peninsula Clean Energy ranks 416 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 416 | Peninsula Clean Energy this page | 2 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Peninsula Clean Energy29 people at Peninsula Clean Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 14 managers and 9 directors are where interconnection and procurement decisions start.
By seniority
29 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Head | 1 |
| Director | 9 |
| Manager | 14 |
| Senior | 3 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Peninsula Clean Energy project
All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 29 contacts.
Get alerts for Peninsula Clean Energy
We email you when Peninsula Clean Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Peninsula Clean Energy project and the 29 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.