FieldProspects

Pedal Steel Solar

Power developer2 projects on record Data as of

Pedal Steel Solar has 2 planned power projects totaling 330 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 2 states and 1 technology.

330MW
planned, 2 projects
0MW
operating, 0 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
2
states
Map

Where Pedal Steel Solar's planned pipeline sits

Planned MW by state. The 2 largest states hold 330 MW of the 330 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Oklahoma180 MW1 project, 55% of planned
  2. Arkansas150 MW1 project, 45% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
330 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 330 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar2330 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 2 planned projects (0%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Pedal Steel Solar's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Pedal Steel Solar's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 2026 2027 330 MW 2028
View as table
YearProjectsMW
202600 MW
202700 MW
20282330 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Pedal Steel Solar's planned MW sits entirely in Southwest Power Pool (SPP).

Figure 2

Planned MW by grid operator

2 planned projects

Southwest Power Pool (SPP) 330 MW 2 projects
View as table
GridPlanned projectsPlanned MW
Southwest Power Pool (SPP)2330 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

0100200300400 330 MW 2023
View as table
Queue yearProjectsMW
20232330 MW
Source. Every planned project has a queue date MW

Pedal Steel Solar against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Pedal Steel Solar ranks 362 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
362 Pedal Steel Solar this page 2
330 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Pedal Steel Solar

Every Pedal Steel Solar project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Pedal Steel SolarSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 330 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Pedal Steel Solar

We email you when Pedal Steel Solar adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Pedal Steel Solar project, with its county, dates and queue status.