Pattern Energy
Pattern Energy has 11 planned power projects totaling 3 GW and 2 operating projects totaling 3.7 GW in the FieldProspects database. 70% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 146 contacts at the company are on file.
Where Pattern Energy's planned pipeline sits
Planned MW by state. The 3 largest states hold 3 GW of the 3 GW.
Largest states
- Illinois2.2 GW5 projects, 73% of planned
- Wisconsin600 MW2 projects, 20% of planned
- Pennsylvania200 MW4 projects, 7% of planned
for every MW Pattern Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Wind | 4 | 2.1 GW | 2 | 3.7 GW |
| Solar | 7 | 950 MW | 0 | 0 MW |
MW by technologySolar has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Pattern Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 8 | 1.3 GW |
| 2028 | 3 | 1.8 GW |
Pipeline by grid and queue year
Pattern Energy's planned MW leans on PJM Interconnection and Midcontinent ISO (MISO). PJM Interconnection alone holds 80% of it.
Planned MW by grid operator
11 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 9 | 2.4 GW |
| Midcontinent ISO (MISO) | 2 | 600 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2017 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 1 | 850 MW |
| 2018 | 1 | 150 MW |
| 2019 | 5 | 500 MW |
| 2020 | 2 | 600 MW |
Changes since the June 4, 2026 snapshot
What moved in Pattern Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Pattern Energy's pipeline moves.
Pattern Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Pattern Energy ranks 52 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 52 | Pattern Energy this page | 11 | 2 | 1.21 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Pattern Energy146 people at Pattern Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 71 managers and 34 directors are where interconnection and procurement decisions start.
By seniority
146 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Partner | 1 |
| VP | 14 |
| Director | 34 |
| Manager | 71 |
| Senior | 23 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Pattern Energy project
All 13 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 146 contacts.
Get alerts for Pattern Energy
We email you when Pattern Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Pattern Energy project and the 146 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.