Pastoria Solar Energy

Power developer1 project on record Data as of

Pastoria Solar Energy has 1 planned power project totaling 80 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 1 technology.

80MW
planned, 1 project
0MW
operating, 0 projects
80MW
interconnection agreement signed, 100% of planned
80MW
under construction, 1 project
0MW
past due, 0 projects
1
state
Map

Where Pastoria Solar Energy's planned pipeline sits

Planned MW by state. Everything sits in California.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California80 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
80 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 80 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage180 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed80 MW, 100%
1 of 1 planned project (100%)
Under construction80 MW, 100%
1 of 1 planned project (100%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of Pastoria Solar Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Pastoria Solar Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
020406080 Snapshot year 80 MW 2026
View as table
YearProjectsMW
2026180 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Pastoria Solar Energy's planned MW sits entirely in California ISO (CAISO).

Figure 2

Planned MW by grid operator

1 planned project

California ISO (CAISO) 80 MW 1 project
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)180 MW

Pastoria Solar Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Pastoria Solar Energy ranks 651 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
651 Pastoria Solar Energy this page 1
80 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Pastoria Solar Energy

Every Pastoria Solar Energy project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Pastoria Solar EnergySort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 80 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Pastoria Solar Energy

We email you when Pastoria Solar Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Pastoria Solar Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.