PacifiCorp

Power developer6 projects on record Data as of

PacifiCorp has 3 planned power projects totaling 361 MW and 3 operating projects totaling 724.8 MW in the FieldProspects database. 1% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 3 states and 2 technologies.

361MW
planned, 3 projects
724.8MW
operating, 3 projects
2MW
interconnection agreement signed, 1% of planned
2MW
under construction, 1 project
0MW
past due, 0 projects
3
states
Map

Where PacifiCorp's planned pipeline sits

Planned MW by state. The 2 largest states hold 361 MW of the 361 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Idaho359 MW2 projects, 99% of planned
  2. Oregon2 MW1 project, 1% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.5MW planned

for every MW PacifiCorp operates today. Battery Storage is most of the gap.

PlannedOperating
Wind 359 MW
724.8 MW
Battery Storage 2 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind2359 MW3724.8 MW
Battery Storage12 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed2 MW, 1%
1 of 3 planned projects (33%)
Under construction2 MW, 1%
1 of 3 planned projects (33%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
None of PacifiCorp's planned MW sits in the seven ISO queues, where 11% of planned MW is past due across all developers.

Share of PacifiCorp's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300 Snapshot year 2026 2027 206 MW 2028
View as table
YearProjectsMW
202600 MW
20272155 MW
20281206 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

PacifiCorp's planned MW leans on PacifiCorp East and PacifiCorp West. PacifiCorp East alone holds 99% of it.

Figure 2

Planned MW by grid operator

3 planned projects

PacifiCorp East 359 MW 2 projects
PacifiCorp West 2 MW 1 project
View as table
GridPlanned projectsPlanned MW
PacifiCorp East2359 MW
PacifiCorp West12 MW
Source. Balancing authorities as listed in the queue

PacifiCorp against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. PacifiCorp ranks 349 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
349 PacifiCorp this page 3
361 MW
3
724.8 MW
2.01

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus PacifiCorp

Every PacifiCorp project

All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: PacifiCorpSort: MW, largest first 6 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
6 projects and 1.1 GW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for PacifiCorp

We email you when PacifiCorp adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every PacifiCorp project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.