Orsted has 26 planned power projects totaling 10 GW and 8 operating projects totaling 2.4 GW in the FieldProspects database. 72% of the planned capacity has an interconnection agreement and 8% is past its listed in-service date. 335 contacts at the company are on file.
Where Orsted's planned pipeline sits
Planned MW by state. The 6 largest states hold 9.1 GW of the 10 GW.
Largest states
- Texas3.8 GW10 projects, 39% of planned
- New York1.8 GW3 projects, 19% of planned
- Rhode Island1.4 GW3 projects, 14% of planned
- Massachusetts1.2 GW1 project, 12% of planned
- New Mexico400 MW3 projects, 4% of planned
- Kansas360 MW1 project, 4% of planned
4 more states with less.
for every MW Orsted operates today. Wind is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Wind | 13 | 6.5 GW | 2 | 380 MW |
| Solar | 12 | 3.3 GW | 4 | 1.5 GW |
| Battery Storage | 1 | 251 MW | 2 | 550 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Orsted's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2023 | 1 | 250 MW |
| 2024 | 1 | 200 MW |
| 2025 | 1 | 300 MW |
| 2026 | 6 | 2.2 GW |
| 2027 | 8 | 2.6 GW |
| 2028 | 2 | 758.4 MW |
| 2029 | 5 | 1.8 GW |
| 2030 | 1 | 653 MW |
| 2031 | 0 | 0 MW |
| 2032 | 0 | 0 MW |
| 2033 | 1 | 1.2 GW |
Pipeline by grid and queue year
Orsted's planned MW leans on ERCOT, ISO New England and New York ISO (NYISO). ERCOT alone holds 32% of it.
Planned MW by grid operator
26 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 8 | 3.2 GW |
| ISO New England | 4 | 2.6 GW |
| New York ISO (NYISO) | 3 | 1.8 GW |
| Southwest Power Pool (SPP) | 6 | 1.4 GW |
| Midcontinent ISO (MISO) | 3 | 750 MW |
| Duke Energy Florida | 2 | 149.8 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2018 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2018 | 5 | 2.4 GW |
| 2019 | 4 | 1.6 GW |
| 2020 | 4 | 1.2 GW |
| 2021 | 1 | 438.8 MW |
| 2022 | 1 | 0 MW |
| 2023 | 1 | 360 MW |
| 2024 | 1 | 379.2 MW |
| 2025 | 1 | 379.2 MW |
| 2026 | 3 | 1.3 GW |
Changes since the June 4, 2026 snapshot
What moved in Orsted's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Orsted's pipeline moves.
Orsted against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Orsted ranks 11 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 11 | Orsted this page | 26 | 8 | 0.24 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Orsted335 people at Orsted
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 184 managers and 28 directors are where interconnection and procurement decisions start.
By seniority
335 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Partner | 4 |
| Head | 58 |
| VP | 7 |
| Director | 28 |
| Manager | 184 |
| Senior | 49 |
| Entry | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Orsted project
All 34 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 335 contacts.
Get alerts for Orsted
We email you when Orsted adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Orsted project and the 335 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.