FieldProspects

Ormat Technologies

Power developer31 projects on record Data as of

Ormat Technologies has 5 planned power projects totaling 312.1 MW and 26 operating projects totaling 586.7 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 4 states and 3 technologies.

312.1MW
planned, 5 projects
586.7MW
operating, 26 projects
312.1MW
interconnection agreement signed, 100% of planned
74MW
under construction, 2 projects
0MW
past due, 0 projects
4
states
Map

Where Ormat Technologies' planned pipeline sits

Planned MW by state. The 3 largest states hold 312.1 MW of the 312.1 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas223.2 MW3 projects, 72% of planned
  2. Oklahoma74.9 MW1 project, 24% of planned
  3. Nevada14 MW1 project, 4% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.5MW planned

for every MW Ormat Technologies operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 298.1 MW
255 MW
Solar 14 MW
77.9 MW
Geothermal none
253.8 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage4298.1 MW4255 MW
Solar114 MW877.9 MW
Geothermal00 MW14253.8 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed312.1 MW, 100%
5 of 5 planned projects (100%)
Under construction74 MW, 24%
2 of 5 planned projects (40%)
Past due0 MW, 0%
0 of 5 planned projects (0%)
0% of Ormat Technologies' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Ormat Technologies' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150 Snapshot year 120.4 MW 2026 2027 2028 2029
View as table
YearProjectsMW
20262120.4 MW
2027288.9 MW
202800 MW
20291102.8 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Ormat Technologies' planned MW leans on ERCOT, Southwest Power Pool (SPP) and Nevada Power (NV Energy). ERCOT alone holds 72% of it.

Figure 2

Planned MW by grid operator

5 planned projects

ERCOT 223.2 MW 3 projects
Southwest Power Pool (SPP) 74.9 MW 1 project
Nevada Power (NV Energy) 14 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT3223.2 MW
Southwest Power Pool (SPP)174.9 MW
Nevada Power (NV Energy)114 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2021 was the biggest year.

050100150200 163.2 MW 2021 2022 2023
View as table
Queue yearProjectsMW
20212163.2 MW
202200 MW
2023174.9 MW
Source. 2 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Ormat Technologies' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
3
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Ormat TechnologiesChange: any 6 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
6 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Ormat Technologies' pipeline moves.

Request access

Ormat Technologies against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Ormat Technologies ranks 373 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
373 Ormat Technologies this page 5
312.1 MW
26
586.7 MW
1.88

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Ormat Technologies

Every Ormat Technologies project

All 31 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Ormat TechnologiesSort: MW, largest first 31 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
31 projects and 898.8 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Ormat Technologies

We email you when Ormat Technologies adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Ormat Technologies project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.