Orion Renewables
Orion Renewables has 6 planned power projects totaling 820 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 55% is past its listed in-service date. 17 contacts at the company are on file.
Where Orion Renewables' planned pipeline sits
Planned MW by state. The 3 largest states hold 820 MW of the 820 MW.
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar + Storage (Hybrid) | 3 | 345 MW | 0 | 0 MW |
| Wind | 1 | 300 MW | 0 | 0 MW |
| Battery Storage | 2 | 175 MW | 0 | 0 MW |
MW by technology3 technologies have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Orion Renewables' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2021 | 1 | 300 MW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 0 | 0 MW |
| 2025 | 2 | 150 MW |
| 2026 | 1 | 125 MW |
| 2027 | 0 | 0 MW |
| 2028 | 0 | 0 MW |
| 2029 | 0 | 0 MW |
| 2030 | 2 | 245 MW |
Pipeline by grid and queue year
Orion Renewables' planned MW leans on Midcontinent ISO (MISO) and Southwest Power Pool (SPP). Midcontinent ISO (MISO) alone holds 70% of it.
Planned MW by grid operator
6 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 4 | 575 MW |
| Southwest Power Pool (SPP) | 2 | 245 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2017 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 1 | 300 MW |
| 2018 | 0 | 0 MW |
| 2019 | 3 | 275 MW |
| 2020 | 1 | 150 MW |
| 2021 | 1 | 95 MW |
Changes since the June 4, 2026 snapshot
What moved in Orion Renewables' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Orion Renewables' pipeline moves.
Orion Renewables against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Orion Renewables ranks 197 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 197 | Orion Renewables this page | 6 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Orion Renewables17 people at Orion Renewables
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 8 managers and 2 directors are where interconnection and procurement decisions start.
By seniority
17 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Partner | 1 |
| Head | 1 |
| VP | 3 |
| Director | 2 |
| Manager | 8 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Orion Renewables project
All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 17 contacts.
Get alerts for Orion Renewables
We email you when Orion Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.