Origis Energy
Origis Energy has 25 planned power projects totaling 2.9 GW and 13 operating projects totaling 1.5 GW in the FieldProspects database. 53% of the planned capacity has an interconnection agreement and 23% is past its listed in-service date. 116 contacts at the company are on file.
Where Origis Energy's planned pipeline sits
Planned MW by state. The 6 largest states hold 2.7 GW of the 2.9 GW.
Largest states
- Texas1.9 GW12 projects, 65% of planned
- California246.2 MW4 projects, 9% of planned
- Mississippi192 MW2 projects, 7% of planned
- Illinois160 MW2 projects, 6% of planned
- Indiana150 MW2 projects, 5% of planned
- Arkansas100 MW1 project, 3% of planned
2 more states with less.
for every MW Origis Energy operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 16 | 1.7 GW | 10 | 1.3 GW |
| Battery Storage | 9 | 1.2 GW | 3 | 199.7 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Origis Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2022 | 1 | 96 MW |
| 2023 | 4 | 310 MW |
| 2024 | 0 | 0 MW |
| 2025 | 3 | 251.6 MW |
| 2026 | 6 | 759.4 MW |
| 2027 | 1 | 252 MW |
| 2028 | 7 | 658.5 MW |
| 2029 | 3 | 558.1 MW |
Pipeline by grid and queue year
Origis Energy's planned MW leans on ERCOT, Midcontinent ISO (MISO) and California ISO (CAISO). ERCOT alone holds 65% of it.
Planned MW by grid operator
25 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 12 | 1.9 GW |
| Midcontinent ISO (MISO) | 9 | 752 MW |
| California ISO (CAISO) | 4 | 246.2 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2018 | 1 | 96 MW |
| 2019 | 6 | 695.5 MW |
| 2020 | 2 | 200 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 6 | 765.2 MW |
| 2024 | 0 | 0 MW |
| 2025 | 2 | 452.6 MW |
Changes since the June 4, 2026 snapshot
What moved in Origis Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Origis Energy's pipeline moves.
Origis Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Origis Energy ranks 55 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 55 | Origis Energy this page | 25 | 13 | 0.51 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Origis Energy116 people at Origis Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 47 managers and 53 directors are where interconnection and procurement decisions start.
By seniority
116 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Founder | 1 |
| Head | 2 |
| VP | 7 |
| Director | 53 |
| Manager | 47 |
| Senior | 4 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Origis Energy project
All 38 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 116 contacts.
Get alerts for Origis Energy
We email you when Origis Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Origis Energy project and the 116 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.