FieldProspects

Oriden Power

Power developer12 projects on record Data as of

Oriden Power has 9 planned power projects totaling 522 MW and 3 operating projects totaling 43 MW in the FieldProspects database. 51% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 19 contacts at the company are on file.

522MW
planned, 9 projects
43MW
operating, 3 projects
267MW
interconnection agreement signed, 51% of planned
33.5MW
under construction, 2 projects
0MW
past due, 0 projects
19
contacts on file
Map

Where Oriden Power's planned pipeline sits

Planned MW by state. The 4 largest states hold 522 MW of the 522 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Indiana370 MW2 projects, 71% of planned
  2. Virginia66 MW2 projects, 13% of planned
  3. New York52.5 MW3 projects, 10% of planned
  4. Pennsylvania33.5 MW2 projects, 6% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
12.1MW planned

for every MW Oriden Power operates today. Solar is most of the gap.

PlannedOperating
Solar 522 MW
43 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar9522 MW343 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed267 MW, 51%
5 of 9 planned projects (56%)
Under construction33.5 MW, 6%
2 of 9 planned projects (22%)
Past due0 MW, 0%
0 of 9 planned projects (0%)
0% of Oriden Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Oriden Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2026 423.5 MW 2027 2028 2029 2030
View as table
YearProjectsMW
202600 MW
20275423.5 MW
2028130 MW
2029232.5 MW
2030136 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Oriden Power's planned MW leans on Midcontinent ISO (MISO), PJM Interconnection and New York ISO (NYISO). Midcontinent ISO (MISO) alone holds 71% of it.

Figure 2

Planned MW by grid operator

9 planned projects

Midcontinent ISO (MISO) 370 MW 2 projects
PJM Interconnection 99.5 MW 4 projects
New York ISO (NYISO) 52.5 MW 3 projects
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)2370 MW
PJM Interconnection499.5 MW
New York ISO (NYISO)352.5 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2024 was the biggest year.

050100150200 2019 2020 2021 2022 2023 185 MW 2024
View as table
Queue yearProjectsMW
2019226 MW
2020256 MW
202100 MW
202200 MW
202300 MW
20241185 MW
Source. 4 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Oriden Power's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
4
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Oriden PowerChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Oriden Power's pipeline moves.

Request access

Oriden Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Oriden Power ranks 267 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
267 Oriden Power this page 9
522 MW
3
43 MW
0.08

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Oriden Power

19 people at Oriden Power

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 6 managers and 5 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

19 contacts

C-Suite 4
Director 5
Manager 6
Senior 4
View as table
SeniorityContacts
C-Suite4
Director5
Manager6
Senior4
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 19 contacts
PersonTitleDepartmentSeniorityContact
19 contacts at Oriden Power for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Oriden Power project

All 12 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Oriden PowerSort: MW, largest first 12 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
12 projects and 565 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 19 contacts.

Request access

Get alerts for Oriden Power

We email you when Oriden Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Oriden Power project and the 19 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.