Oriden Power
Oriden Power has 9 planned power projects totaling 522 MW and 3 operating projects totaling 43 MW in the FieldProspects database. 51% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 19 contacts at the company are on file.
Where Oriden Power's planned pipeline sits
Planned MW by state. The 4 largest states hold 522 MW of the 522 MW.
Largest states
- Indiana370 MW2 projects, 71% of planned
- Virginia66 MW2 projects, 13% of planned
- New York52.5 MW3 projects, 10% of planned
- Pennsylvania33.5 MW2 projects, 6% of planned
for every MW Oriden Power operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 9 | 522 MW | 3 | 43 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Oriden Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 5 | 423.5 MW |
| 2028 | 1 | 30 MW |
| 2029 | 2 | 32.5 MW |
| 2030 | 1 | 36 MW |
Pipeline by grid and queue year
Oriden Power's planned MW leans on Midcontinent ISO (MISO), PJM Interconnection and New York ISO (NYISO). Midcontinent ISO (MISO) alone holds 71% of it.
Planned MW by grid operator
9 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 2 | 370 MW |
| PJM Interconnection | 4 | 99.5 MW |
| New York ISO (NYISO) | 3 | 52.5 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2024 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 2 | 26 MW |
| 2020 | 2 | 56 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 1 | 185 MW |
Changes since the June 4, 2026 snapshot
What moved in Oriden Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Oriden Power's pipeline moves.
Oriden Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Oriden Power ranks 267 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 267 | Oriden Power this page | 9 | 3 | 0.08 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Oriden Power19 people at Oriden Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 6 managers and 5 directors are where interconnection and procurement decisions start.
By seniority
19 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Director | 5 |
| Manager | 6 |
| Senior | 4 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Oriden Power project
All 12 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 19 contacts.
Get alerts for Oriden Power
We email you when Oriden Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Oriden Power project and the 19 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.