Open Road Renewables
Open Road Renewables has 15 planned power projects totaling 1.9 GW in the FieldProspects database and no operating project on record. 99% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 8 contacts at the company are on file.
Where Open Road Renewables' planned pipeline sits
Planned MW by state. The 4 largest states hold 1.9 GW of the 1.9 GW.
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 13 | 1.7 GW | 0 | 0 MW |
| Battery Storage | 2 | 260 MW | 0 | 0 MW |
MW by technologySolar and Battery Storage have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Open Road Renewables' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 7 | 759.9 MW |
| 2027 | 1 | 20 MW |
| 2028 | 2 | 250 MW |
| 2029 | 5 | 911.5 MW |
Pipeline by grid and queue year
Open Road Renewables' planned MW leans on PJM Interconnection, Midcontinent ISO (MISO) and New York ISO (NYISO). PJM Interconnection alone holds 91% of it.
Planned MW by grid operator
15 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 13 | 1.8 GW |
| Midcontinent ISO (MISO) | 1 | 160 MW |
| New York ISO (NYISO) | 1 | 20 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 1 | 50 MW |
| 2017 | 1 | 70 MW |
| 2018 | 4 | 480 MW |
| 2019 | 4 | 509.9 MW |
| 2020 | 4 | 811.5 MW |
Changes since the June 4, 2026 snapshot
What moved in Open Road Renewables' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Open Road Renewables' pipeline moves.
Open Road Renewables against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Open Road Renewables ranks 88 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 88 | Open Road Renewables this page | 15 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Open Road Renewables8 people at Open Road Renewables
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 manager and 1 director are where interconnection and procurement decisions start.
By seniority
8 contacts
View as table
| Seniority | Contacts |
|---|---|
| Founder | 1 |
| VP | 5 |
| Director | 1 |
| Manager | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Open Road Renewables project
All 15 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 8 contacts.
Get alerts for Open Road Renewables
We email you when Open Road Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Open Road Renewables project and the 8 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.