Opdenergy

Power developer4 projects on record Data as of

Opdenergy has 2 planned power projects totaling 175 MW and 2 operating projects totaling 238.8 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 71% is past its listed in-service date. 8 contacts at the company are on file.

175MW
planned, 2 projects
238.8MW
operating, 2 projects
175MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
125MW
past due, 1 project
8
contacts on file
Map

Where Opdenergy's planned pipeline sits

Planned MW by state. The 2 largest states hold 175 MW of the 175 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Louisiana125 MW1 project, 71% of planned
  2. Virginia50 MW1 project, 29% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.7MW planned

for every MW Opdenergy operates today.

PlannedOperating
Solar 175 MW
238.8 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar2175 MW2238.8 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed175 MW, 100%
2 of 2 planned projects (100%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due125 MW, 71%
1 of 2 planned projects (50%)
71% of Opdenergy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Opdenergy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150 Snapshot year 125 MW 2023 2024 2025 2026 2027 2028
View as table
YearProjectsMW
20231125 MW
202400 MW
202500 MW
202600 MW
202700 MW
2028150 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Opdenergy's planned MW leans on Midcontinent ISO (MISO) and PJM Interconnection. Midcontinent ISO (MISO) alone holds 71% of it.

Figure 2

Planned MW by grid operator

2 planned projects

Midcontinent ISO (MISO) 125 MW 1 project
PJM Interconnection 50 MW 1 project
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)1125 MW
PJM Interconnection150 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

050100150 125 MW 2019 2020
View as table
Queue yearProjectsMW
20191125 MW
2020150 MW
Source. Every planned project has a queue date MW

Opdenergy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Opdenergy ranks 546 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
546 Opdenergy this page 2
175 MW
2
238.8 MW
1.36

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Opdenergy

8 people at Opdenergy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 3 managers and 3 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

8 contacts

Head 1
Director 3
Manager 3
Senior 1
View as table
SeniorityContacts
Head1
Director3
Manager3
Senior1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 8 contacts
PersonTitleDepartmentSeniorityContact
8 contacts at Opdenergy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Opdenergy project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: OpdenergySort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 413.8 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 8 contacts.

Request access

Get alerts for Opdenergy

We email you when Opdenergy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Opdenergy project and the 8 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.