Opdenergy
Opdenergy has 2 planned power projects totaling 175 MW and 2 operating projects totaling 238.8 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 71% is past its listed in-service date. 8 contacts at the company are on file.
Where Opdenergy's planned pipeline sits
Planned MW by state. The 2 largest states hold 175 MW of the 175 MW.
for every MW Opdenergy operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 2 | 175 MW | 2 | 238.8 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Opdenergy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2023 | 1 | 125 MW |
| 2024 | 0 | 0 MW |
| 2025 | 0 | 0 MW |
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 1 | 50 MW |
Pipeline by grid and queue year
Opdenergy's planned MW leans on Midcontinent ISO (MISO) and PJM Interconnection. Midcontinent ISO (MISO) alone holds 71% of it.
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 1 | 125 MW |
| PJM Interconnection | 1 | 50 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 1 | 125 MW |
| 2020 | 1 | 50 MW |
Opdenergy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Opdenergy ranks 546 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 546 | Opdenergy this page | 2 | 2 | 1.36 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Opdenergy8 people at Opdenergy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 3 managers and 3 directors are where interconnection and procurement decisions start.
By seniority
8 contacts
View as table
| Seniority | Contacts |
|---|---|
| Head | 1 |
| Director | 3 |
| Manager | 3 |
| Senior | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Opdenergy project
All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 8 contacts.
Get alerts for Opdenergy
We email you when Opdenergy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Opdenergy project and the 8 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.