FieldProspects

On Energy

Power developer9 projects on record Data as of

On Energy has 3 planned power projects totaling 1.1 GW and 6 operating projects totaling 68.2 MW in the FieldProspects database. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 13 contacts at the company are on file.

1.1GW
planned, 3 projects
68.2MW
operating, 6 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
13
contacts on file
Map

Where On Energy's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas1.1 GW3 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
16.4MW planned

for every MW On Energy operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 617.1 MW
68.2 MW
Solar 502 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage2617.1 MW668.2 MW
Solar1502 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 3 planned projects (0%)
Under construction0 MW, 0%
0 of 3 planned projects (0%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of On Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of On Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 2026 2027 2028 1 GW 2029
View as table
YearProjectsMW
202600 MW
20271100.4 MW
202800 MW
202921 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

On Energy's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

3 planned projects

ERCOT 1.1 GW 3 projects
View as table
GridPlanned projectsPlanned MW
ERCOT31.1 GW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2025 was the biggest year.

05001k1.5k 2024 1 GW 2025
View as table
Queue yearProjectsMW
20241100.4 MW
202521 GW
Source. Every planned project has a queue date MW

On Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. On Energy ranks 150 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
150 On Energy this page 3
1.1 GW
6
68.2 MW
0.06

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus On Energy

13 people at On Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 3 managers and 2 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

13 contacts

C-Suite 3
Head 2
VP 3
Director 2
Manager 3
View as table
SeniorityContacts
C-Suite3
Head2
VP3
Director2
Manager3
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 13 contacts
PersonTitleDepartmentSeniorityContact
13 contacts at On Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every On Energy project

All 9 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: On EnergySort: MW, largest first 9 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
9 projects and 1.2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 13 contacts.

Request access

Get alerts for On Energy

We email you when On Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every On Energy project and the 13 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.