NYC Energy

Power developer4 projects on record Data as of

NYC Energy has 4 planned power projects totaling 600 MW in the FieldProspects database and no operating project on record. 50% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 1 technology.

600MW
planned, 4 projects
0MW
operating, 0 projects
300MW
interconnection agreement signed, 50% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
state
Map

Where NYC Energy's planned pipeline sits

Planned MW by state. Everything sits in New York.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. New York600 MW4 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
600 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 600 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage4600 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed300 MW, 50%
2 of 4 planned projects (50%)
Under construction0 MW, 0%
0 of 4 planned projects (0%)
Past due0 MW, 0%
0 of 4 planned projects (0%)
0% of NYC Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of NYC Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300 Snapshot year 2026 300 MW 2027 300 MW 2028
View as table
YearProjectsMW
202600 MW
20272300 MW
20282300 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

NYC Energy's planned MW sits entirely in New York ISO (NYISO).

Figure 2

Planned MW by grid operator

4 planned projects

New York ISO (NYISO) 600 MW 4 projects
View as table
GridPlanned projectsPlanned MW
New York ISO (NYISO)4600 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

0100200300 2015 2016 2017 2018 2019 220.1 MW 2020
View as table
Queue yearProjectsMW
2015179.9 MW
201600 MW
201700 MW
201800 MW
201900 MW
20201220.1 MW
Source. 2 projects without a queue date are left out MW

NYC Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. NYC Energy ranks 252 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
252 NYC Energy this page 4
600 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus NYC Energy

Every NYC Energy project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: NYC EnergySort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 600 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for NYC Energy

We email you when NYC Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every NYC Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.