FieldProspects

NRG Energy

Power developer2 projects on record Data as of

NRG Energy has 2 planned power projects totaling 1.3 GW in the FieldProspects database and no operating project on record. 95% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 2 states and 2 technologies.

1.3GW
planned, 2 projects
0MW
operating, 0 projects
1.3GW
interconnection agreement signed, 95% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
2
states
Map

Where NRG Energy's planned pipeline sits

Planned MW by state. The 2 largest states hold 1.3 GW of the 1.3 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas1.3 GW1 project, 95% of planned
  2. California70 MW1 project, 5% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1.3 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Natural Gas 1.3 GW
none
Battery Storage 70 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Natural Gas11.3 GW00 MW
Battery Storage170 MW00 MW

MW by technologyNatural Gas and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.3 GW, 95%
1 of 2 planned projects (50%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of NRG Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of NRG Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 70 MW 2026 2027 2028 1.3 GW 2029
View as table
YearProjectsMW
2026170 MW
202700 MW
202800 MW
202911.3 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

NRG Energy's planned MW leans on ERCOT and California ISO (CAISO). ERCOT alone holds 95% of it.

Figure 2

Planned MW by grid operator

2 planned projects

ERCOT 1.3 GW 1 project
California ISO (CAISO) 70 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT11.3 GW
California ISO (CAISO)170 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2025 was the biggest year.

05001k1.5k 1.3 GW 2025
View as table
Queue yearProjectsMW
202511.3 GW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in NRG Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: NRG EnergyChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when NRG Energy's pipeline moves.

Request access

NRG Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. NRG Energy ranks 117 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
117 NRG Energy this page 2
1.3 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus NRG Energy

Every NRG Energy project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: NRG EnergySort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 1.3 GW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for NRG Energy

We email you when NRG Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every NRG Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.