Novel Energy Solutions
Novel Energy Solutions has 1 planned power project totaling 1 MW and 8 operating projects totaling 9.5 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 49 contacts at the company are on file.
Where Novel Energy Solutions' planned pipeline sits
Planned MW by state. Everything sits in Minnesota.
Largest states
- Minnesota1 MW1 project, 100% of planned
for every MW Novel Energy Solutions operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 1 MW | 8 | 9.5 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Novel Energy Solutions' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 1 | 1 MW |
Pipeline by grid and queue year
Novel Energy Solutions' planned MW sits entirely in Midcontinent ISO (MISO).
Planned MW by grid operator
1 planned project
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 1 | 1 MW |
Novel Energy Solutions against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Novel Energy Solutions ranks 792 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 792 | Novel Energy Solutions this page | 1 | 8 | 9.50 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Novel Energy Solutions49 people at Novel Energy Solutions
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 27 managers and 7 directors are where interconnection and procurement decisions start.
By seniority
49 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Partner | 2 |
| VP | 4 |
| Director | 7 |
| Manager | 27 |
| Senior | 5 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Novel Energy Solutions project
All 9 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 49 contacts.
Get alerts for Novel Energy Solutions
We email you when Novel Energy Solutions adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Novel Energy Solutions project and the 49 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.