NJR Clean Energy Ventures
NJR Clean Energy Ventures has 5 planned power projects totaling 38.7 MW and 14 operating projects totaling 76.2 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 4% is past its listed in-service date.
Where NJR Clean Energy Ventures' planned pipeline sits
Planned MW by state. The 2 largest states hold 38.7 MW of the 38.7 MW.
Largest states
- New Jersey37.4 MW4 projects, 97% of planned
- Maine1.3 MW1 project, 3% of planned
for every MW NJR Clean Energy Ventures operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 5 | 38.7 MW | 14 | 76.2 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of NJR Clean Energy Ventures' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2025 | 1 | 1.6 MW |
| 2026 | 4 | 37.1 MW |
Pipeline by grid and queue year
NJR Clean Energy Ventures' planned MW leans on PJM Interconnection and ISO New England. PJM Interconnection alone holds 97% of it.
Planned MW by grid operator
5 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 4 | 37.4 MW |
| ISO New England | 1 | 1.3 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2018 | 1 | 1.6 MW |
| 2019 | 0 | 0 MW |
| 2020 | 2 | 29.8 MW |
Changes since the June 4, 2026 snapshot
What moved in NJR Clean Energy Ventures' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when NJR Clean Energy Ventures' pipeline moves.
NJR Clean Energy Ventures against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. NJR Clean Energy Ventures ranks 699 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 699 | NJR Clean Energy Ventures this page | 5 | 14 | 1.97 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus NJR Clean Energy Ventures10 people at NJR Clean Energy Ventures
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 8 managers and 1 director are where interconnection and procurement decisions start.
By seniority
10 contacts
View as table
| Seniority | Contacts |
|---|---|
| Director | 1 |
| Manager | 8 |
| Senior | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every NJR Clean Energy Ventures project
All 19 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 10 contacts.
Get alerts for NJR Clean Energy Ventures
We email you when NJR Clean Energy Ventures adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every NJR Clean Energy Ventures project and the 10 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.