NIPSCO

Power developer1 project on record Data as of

NIPSCO has 1 planned power project totaling 240 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 100% is past its listed in-service date. The projects sit in 1 state and 1 technology.

240MW
planned, 1 project
0MW
operating, 0 projects
240MW
interconnection agreement signed, 100% of planned
240MW
under construction, 1 project
240MW
past due, 1 project
1
state
Map

Where NIPSCO's planned pipeline sits

Planned MW by state. Everything sits in Indiana.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Indiana240 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
240 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 240 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1240 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed240 MW, 100%
1 of 1 planned project (100%)
Under construction240 MW, 100%
1 of 1 planned project (100%)
Past due240 MW, 100%
1 of 1 planned project (100%)
100% of NIPSCO's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of NIPSCO's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300 Snapshot year 240 MW 2023 2024 2025 2026
View as table
YearProjectsMW
20231240 MW
202400 MW
202500 MW
202600 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

NIPSCO's planned MW sits entirely in Midcontinent ISO (MISO).

Figure 2

Planned MW by grid operator

1 planned project

Midcontinent ISO (MISO) 240 MW 1 project
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)1240 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2018 was the biggest year.

0100200300 240 MW 2018
View as table
Queue yearProjectsMW
20181240 MW
Source. Every planned project has a queue date MW

NIPSCO against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. NIPSCO ranks 442 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
442 NIPSCO this page 1
240 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus NIPSCO

Every NIPSCO project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: NIPSCOSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 240 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for NIPSCO

We email you when NIPSCO adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every NIPSCO project, with its county, dates and queue status.