NineDot Energy has 20 planned power projects totaling 85.8 MW and 8 operating projects totaling 34 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 30 contacts at the company are on file.
Where NineDot Energy's planned pipeline sits
Planned MW by state. Everything sits in New York.
Largest states
- New York85.8 MW20 projects, 100% of planned
for every MW NineDot Energy operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 20 | 85.8 MW | 8 | 34 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of NineDot Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 4.9 MW |
| 2027 | 19 | 80.9 MW |
Pipeline by grid and queue year
NineDot Energy's planned MW sits entirely in New York ISO (NYISO).
Planned MW by grid operator
20 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| New York ISO (NYISO) | 20 | 85.8 MW |
Changes since the June 4, 2026 snapshot
What moved in NineDot Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when NineDot Energy's pipeline moves.
NineDot Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. NineDot Energy ranks 648 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 648 | NineDot Energy this page | 20 | 8 | 0.40 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus NineDot Energy30 people at NineDot Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 11 managers and 7 directors are where interconnection and procurement decisions start.
By seniority
30 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| Founder | 2 |
| Partner | 1 |
| VP | 4 |
| Director | 7 |
| Manager | 11 |
| Senior | 3 |
| Entry | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every NineDot Energy project
All 28 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 30 contacts.
Get alerts for NineDot Energy
We email you when NineDot Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every NineDot Energy project and the 30 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.