Nexus Renewable Power

Power developer6 projects on record Data as of

Nexus Renewable Power has 6 planned power projects totaling 846.1 MW in the FieldProspects database and no operating project on record. 76% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 3 contacts at the company are on file.

846.1MW
planned, 6 projects
0MW
operating, 0 projects
645.2MW
interconnection agreement signed, 76% of planned
221.2MW
under construction, 2 projects
0MW
past due, 0 projects
3
contacts on file
Map

Where Nexus Renewable Power's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas846.1 MW6 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
846.1 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 504.5 MW
none
Solar 341.6 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage4504.5 MW00 MW
Solar2341.6 MW00 MW

MW by technologyBattery Storage and Solar have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed645.2 MW, 76%
5 of 6 planned projects (83%)
Under construction221.2 MW, 26%
2 of 6 planned projects (33%)
Past due0 MW, 0%
0 of 6 planned projects (0%)
0% of Nexus Renewable Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Nexus Renewable Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 444.3 MW 2026 2027 2028
View as table
YearProjectsMW
20264444.3 MW
20271200.9 MW
20281200.9 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Nexus Renewable Power's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

6 planned projects

ERCOT 846.1 MW 6 projects
View as table
GridPlanned projectsPlanned MW
ERCOT6846.1 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

0100200300 2021 2022 200.9 MW 2023
View as table
Queue yearProjectsMW
20211170.8 MW
2022152.3 MW
20231200.9 MW
Source. 3 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Nexus Renewable Power's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
4
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Nexus Renewable PowerChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Nexus Renewable Power's pipeline moves.

Request access

Nexus Renewable Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Nexus Renewable Power ranks 194 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
194 Nexus Renewable Power this page 6
846.1 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Nexus Renewable Power

3 people at Nexus Renewable Power

Contacts with title, seniority, department, email and LinkedIn, counted here and never named.

Figure 4

By seniority

3 contacts

C-Suite 2
VP 1
View as table
SeniorityContacts
C-Suite2
VP1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 3 contacts
PersonTitleDepartmentSeniorityContact
3 contacts at Nexus Renewable Power for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Nexus Renewable Power project

All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Nexus Renewable PowerSort: MW, largest first 6 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
6 projects and 846.1 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 3 contacts.

Request access

Get alerts for Nexus Renewable Power

We email you when Nexus Renewable Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Nexus Renewable Power project and the 3 people behind them.