FieldProspects

NextEra Energy Resources Interconnection Holdings LLC

Power developer2 projects on record Data as of

NextEra Energy Resources Interconnection Holdings LLC has 2 planned power projects totaling 575 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date.

575MW
planned, 2 projects
0MW
operating, 0 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
2
states
Map

Where NextEra Energy Resources Interconnection Holdings LLC's planned pipeline sits

Planned MW by state. The 2 largest states hold 575 MW of the 575 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas455 MW1 project, 79% of planned
  2. New York120 MW1 project, 21% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
575 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 455 MW
none
Battery Storage 120 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1455 MW00 MW
Battery Storage1120 MW00 MW

MW by technologySolar and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 2 planned projects (0%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of NextEra Energy Resources Interconnection Holdings LLC's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of NextEra Energy Resources Interconnection Holdings LLC's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2026 2027 2028 455 MW 2029 2030
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
20291455 MW
20301120 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

NextEra Energy Resources Interconnection Holdings LLC's planned MW leans on ERCOT and New York ISO (NYISO). ERCOT alone holds 79% of it.

Figure 2

Planned MW by grid operator

2 planned projects

ERCOT 455 MW 1 project
New York ISO (NYISO) 120 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT1455 MW
New York ISO (NYISO)1120 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2026 was the biggest year.

0200400600 2024 2025 455 MW 2026
View as table
Queue yearProjectsMW
20241120 MW
202500 MW
20261455 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in NextEra Energy Resources Interconnection Holdings LLC's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 455 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: NextEra Energy Resources Interconnection Holdings LLCChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when NextEra Energy Resources Interconnection Holdings LLC's pipeline moves.

Request access

NextEra Energy Resources Interconnection Holdings LLC against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. NextEra Energy Resources Interconnection Holdings LLC ranks 260 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
260 NextEra Energy Resources Interconnection Holdings LLC this page 2
575 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus NextEra Energy Resources Interconnection Holdings LLC

Every NextEra Energy Resources Interconnection Holdings LLC project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: NextEra Energy Resources Interconnection Holdings LLCSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 575 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for NextEra Energy Resources Interconnection Holdings LLC

We email you when NextEra Energy Resources Interconnection Holdings LLC adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every NextEra Energy Resources Interconnection Holdings LLC project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.