Power developer24 projects on record Data as of

Nexamp has 4 planned power projects totaling 311.1 MW and 20 operating projects totaling 66.4 MW in the FieldProspects database. 3% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 290 contacts at the company are on file.

311.1MW
planned, 4 projects
66.4MW
operating, 20 projects
9.5MW
interconnection agreement signed, 3% of planned
9.5MW
under construction, 2 projects
0MW
past due, 0 projects
290
contacts on file
Map

Where Nexamp's planned pipeline sits

Planned MW by state. The 2 largest states hold 311.1 MW of the 311.1 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas301.6 MW2 projects, 97% of planned
  2. Illinois9.5 MW2 projects, 3% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
4.7MW planned

for every MW Nexamp operates today. Solar is most of the gap.

PlannedOperating
Solar 311.1 MW
61.4 MW
Battery Storage none
5 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar3311.1 MW1661.4 MW
Battery Storage10 MW45 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed9.5 MW, 3%
2 of 4 planned projects (50%)
Under construction9.5 MW, 3%
2 of 4 planned projects (50%)
Past due0 MW, 0%
0 of 4 planned projects (0%)
0% of Nexamp's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Nexamp's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 5 MW 2026 306.1 MW 2027
View as table
YearProjectsMW
202615 MW
20273306.1 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Nexamp's planned MW leans on ERCOT and Midcontinent ISO (MISO). ERCOT alone holds 97% of it.

Figure 2

Planned MW by grid operator

4 planned projects

ERCOT 301.6 MW 2 projects
Midcontinent ISO (MISO) 9.5 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT2301.6 MW
Midcontinent ISO (MISO)29.5 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

0100200300400 301.6 MW 2023
View as table
Queue yearProjectsMW
20232301.6 MW
Source. 2 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Nexamp's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
2
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: NexampChange: any 2 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
2 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Nexamp's pipeline moves.

Request access

Nexamp against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Nexamp ranks 375 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
375 Nexamp this page 4
311.1 MW
20
66.4 MW
0.21

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Nexamp

290 people at Nexamp

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 131 managers and 54 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

290 contacts

C-Suite 5
Partner 1
VP 41
Director 54
Manager 131
Senior 57
Entry 1
View as table
SeniorityContacts
C-Suite5
Partner1
VP41
Director54
Manager131
Senior57
Entry1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 290 contacts
PersonTitleDepartmentSeniorityContact
290 contacts at Nexamp for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Nexamp project

All 24 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: NexampSort: MW, largest first 24 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
24 projects and 377.5 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 290 contacts.

Request access

Get alerts for Nexamp

We email you when Nexamp adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Nexamp project and the 290 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.